Evaluation Research about the Post Environmental Impact Assessment of Cascade Hydropower Engineering which Based on Matter-Element and Analytic-Hierarchy Coupling Model

2013 ◽  
Vol 437 ◽  
pp. 1038-1045
Author(s):  
Bin Bin Tang ◽  
Bao Chen Liu ◽  
Zhi Hua Deng

The environmental post evaluation index system is proposed to evaluate the cascade hydropower project`s post environmental impact assessment. We also constructed an evaluation method based on Matter-element and Analytic-hierarchy coupling model (FME-AHP) to apply to the environmental impact assessment of Yuan Shui cascade hydropower stations. It can test the index system and evaluation method is scientific and validity or not. We hope we can provide some experience and reference for the environmental impact assessment of the hydropower exploitation in key river basin both in China and abroad.

2021 ◽  
Vol 259 ◽  
pp. 05002
Author(s):  
Liu Yan

Improving the evaluation index system for environmental impact assessment engineers is one of the important tasks in the current environmental protection talent training. According to the basic requirements of the professional qualification examination for environmental impact assessment engineers, the professional quality evaluation index system of environmental impact assessment engineers has been constructed from three levels of basic requirements, relevant knowledge and practical skills, and the index weight set is established through Yaahp software, with the aim of being an environmental protection talent The construction of the evaluation system provides thinking.


2019 ◽  
Vol 267 ◽  
pp. 04018
Author(s):  
Xuying Yuan ◽  
Chuyun Li ◽  
Qin Chen ◽  
Hongjie Peng ◽  
Ying Guo ◽  
...  

The problems were analyzed about the environmental impact in the construction projects of water conservancy in China. Some relevant data and relevant guidelines were combined with the actual work which were referred to several environmental impact assessment reports. An index system was proposed about environmental impact assessment of ecological improvement project in Xishui River.


2011 ◽  
Vol 281 ◽  
pp. 195-200
Author(s):  
He Rui Cui ◽  
Da Fang Qiu ◽  
Lu Chen

As environment impact has become the important constraining factors to the power transmission project, so it is necessary to expand the scope of environmental impact assessment (EIA) to provide some information to relevant departments for decision-making. This paper selected fuzzy comprehensive evaluation method to assess the environmental impact, which is fit for the uncertainties of the EIA. The results show that the project's impact on the environment is satisfactory and it still exists insufficient in environment protection and the improvement is still potential. The innovation of this paper is to assign the comprehensive evaluation vector by considering the weighted average confidence degree of the comments set-valued, so it can calculate the assessment values more accurately.


2010 ◽  
Vol 156-157 ◽  
pp. 79-83 ◽  
Author(s):  
Jian Yu Chu ◽  
You Po Su

The site selection for earthquake emergency shelter is important to ensure the safety and service ability of shelter in earthquake disaster. It is aim to establish earthquake emergency shelter site evaluation index system, make use of analytic hierarchy process method to determine the index weight, using comprehensive fuzzy evaluation method to evaluate and order the shelters in certain areas, and ultimately select earquake emergency shelters.


2012 ◽  
Vol 614-615 ◽  
pp. 999-1007
Author(s):  
Zhi Dong Wang ◽  
Ke Li ◽  
Zi Fa Liu

The characteristics of wind power such as wave properties, intermittence, seasonal nature, counter regulation and so on have negative effect on power grid; grid-connected wind power on a scale is limited. To aim at the problem that there lacks quantification evaluation method on grid-connected wind power, an comprehensive evaluation index system concerning safety, adequacy, power quality and economy on the power grid which wind power is accepted. By using current advanced fuzzy interval analytic hierarchy process (FIAHP) , analyzing index such as static stability reserve coefficient, peak margin and transmission reliability margin and so on, coming up with the potential risk, thus on the condition of system safety and steady operation, penetrating power can be maximization, utilization rate improved. At last, analysis of the example proves that the evaluation index system and evaluation method is scientific and feasible.