scholarly journals Robust resource-constrained max-NPV project scheduling with stochastic activity duration

OR Spectrum ◽  
2018 ◽  
Vol 41 (1) ◽  
pp. 219-254 ◽  
Author(s):  
Yangyang Liang ◽  
Nanfang Cui ◽  
Tian Wang ◽  
Erik Demeulemeester
2013 ◽  
Vol 483 ◽  
pp. 607-610 ◽  
Author(s):  
Chun Jie Zhong ◽  
Ying Yu ◽  
Yun Lang Jia

A resource-constrained project scheduling problem with stochastic resource-dependent activity durations is presented in this paper,and the two-point method is employed to simulate the uncertain property.Furthermore a genetic algorithm combined with this method is provided to solve the problem. Compared with the results from the genetic with Monte Carlo simulation, the proposed method is verified to be effective and more efficient.