Three notes on scheduling unit-length jobs with precedence constraints to minimize the total completion time
2003 ◽
Vol 31
(4)
◽
pp. 323-326
◽
Keyword(s):
2005 ◽
Vol 62
(2)
◽
pp. 275-279
◽
2009 ◽
Vol 36
(3)
◽
pp. 698-710
◽
Keyword(s):
1995 ◽
Vol 26
(11)
◽
pp. 2203-2217
◽
2001 ◽
Vol 52
(4)
◽
pp. 449-462
Keyword(s):
2012 ◽
Vol 59
(4)
◽
pp. 585-597
◽
Keyword(s):
1997 ◽
Vol 20
(5)
◽
pp. 207-212
◽