Computational experiment for determination of the cyclic durability of a boiler drum of a thermal power plant

2012 ◽  
Vol 48 (1) ◽  
pp. 76-82 ◽  
Author(s):  
B. D. Drobenko
2007 ◽  
Vol 62 (2) ◽  
pp. 101-108 ◽  
Author(s):  
Julieta Marrero ◽  
Griselda Polla ◽  
Raúl Jiménez Rebagliati ◽  
Rita Plá ◽  
Darío Gómez ◽  
...  

2017 ◽  
Vol 65 ◽  
pp. 75-91 ◽  
Author(s):  
Tiago Rodrigo Silva ◽  
Regina Mambeli Barros ◽  
Geraldo Lúcio Tiago Filho ◽  
Ivan Felipe Silva dos Santos

2004 ◽  
Vol 38 (6) ◽  
pp. 337-340
Author(s):  
V. F. Rezinskikh ◽  
V. I. Gladshtein ◽  
K. R. Linkevich ◽  
A. A. Lyubimov ◽  
V. G. Nikitaev ◽  
...  

2014 ◽  
Vol 1073-1076 ◽  
pp. 733-737
Author(s):  
Yun Fei Zhang

In order to solve the problem of serious dust and difficult to control in coal conveyer belt without tissue in a thermal power plant of Shanxi, this paper introduces the principle of dry fog dust suppression technology, apparatus components, advantages and disadvantages and the application in a thermal power plant. Determination of dust concentration when the dry fog dust suppression work or does not work. Data show that the rate of dry fog dust suppression is generally greater than 80%, the dust concentration is less than 10 mg/m3, especially the suppression effect on small particles of less than 10 μm dust is obvious. Practice shows that dust has been effectively suppressed and it has a good application prospect, when this technology and device are applied.


2020 ◽  
Vol 11 (12) ◽  
pp. 2126-2132
Author(s):  
Özgen Ercan ◽  
Faruk Dinçer ◽  
Deniz Sarı ◽  
Özcan Ceylan ◽  
Fatih Kemal Di̇nçer

SIMULATION ◽  
2017 ◽  
Vol 93 (11) ◽  
pp. 995-1010 ◽  
Author(s):  
Sreepradha Chandrasekharan ◽  
Rames Chandra Panda ◽  
Bhuvaneswari Natrajan Swaminathan

The subcritical coal-fired boilers of thermal power plants consist of a combustion chamber, economizer unit, drum unit (drum, riser, and downcomer), superheater unit (primary superheater, secondary superheater, and final superheater), and reheater unit. The input and output of these units are highly interactive in nature. The efficiency of the subcritical plants is only around 33%. The efficiency needs to be increased to produce more power for the increasing demand, which can be achieved only by implementing supercritical technology or ultra-supercritical technology. However, the conversion of existing subcritical power plants to supercritical power plants is impossible due to the installation cost. So in order to increase the overall efficiency of the existing subcritical power plants, boilers of such units must be examined in order to find safer operational practices. This paper highlights the mathematical modeling of the economizer unit and drum unit of boiler, which can help in enhancing the performance of the boiler system of the power plant. Mass and energy balances for the integrating boiler units have been formulated using first principle laws. The developed model has then been validated with actual plant data obtained from a 210 MW coal-fired thermal power plant. The performance of the open loop responses of the model are analyzed and are included in the results and discussion of the paper. The model provides support for level, pressure, and temperature measurements and predictions. The effect of changes in the parameters of the boiler are studied and discussed in detail.


Sign in / Sign up

Export Citation Format

Share Document