Intelligent demand forecasting supported risk management systems for fast fashion inventory management

Author(s):  
T.-M. Choi ◽  
S. Ren
2020 ◽  
pp. 77-90
Author(s):  
V.D. Gerami ◽  
I.G. Shidlovskii

The article presents a special modification of the EOQ formula and its application to the accounting of the cargo capacity factor for the relevant procedures for optimizing deliveries when renting storage facilities. The specified development will allow managers to take into account the following process specifics in the format of a simulated supply chain when managing inventory. First of all, it will allow considering the most important factor of cargo capacity when optimizing stocks. Moreover, this formula will make it possible to find the optimal strategy for the supply of goods if, also, it is necessary to take into account the combined effect of several factors necessary for practice, which will undoubtedly affect decision-making procedures. Here we are talking about the need for additional consideration of the following essential attributes of the simulated cash flow of the supply chain: 1) time value of money; 2) deferral of payment of the cost of the order; 3) pre-agreed allowable delays in the receipt of revenue from goods sold. Developed analysis and optimization procedures have been implemented to models of this type that are interesting and important for a business. This — inventory management systems, the format of which is related to the special concept of efficient supply. We are talking about models where the presence of the specified delays for the outgoing cash flows allows you to pay for the order and the corresponding costs of the supply chain from the corresponding revenue on the re-order interval. Accordingly, the necessary and sufficient conditions are established based on which managers will be able to identify models of the specified type. The purpose of the article is to draw the attention of managers to real opportunities to improve the efficiency of inventory management systems by taking into account these factors for a simulated supply chain.


Author(s):  
Anom Bowolaksono ◽  
Fatma Lestari ◽  
Saraswati Andani Satyawardhani ◽  
Abdul Kadir ◽  
Cynthia Febrina Maharani ◽  
...  

Developing countries face various challenges in implementing bio-risk management systems in the laboratory. In addition, educational settings are considered as workplaces with biohazard risks. Every activity in a laboratory facility carries many potential hazards that can impact human health and the environment and may cause laboratory incidents, including Laboratory Acquired Infections (LAIs). In an effort to minimize the impact and occurrence of these incidents, it is necessary to evaluate the implementation of a bio-risk management system in every activity that involves handling biological agents. This study was conducted in an Indonesian higher-education institution, herein coded as University Y. This is a descriptive, semi-quantitative study aimed at analysing and evaluating the implementation of the bio-risk management systems used in laboratories by analysing the achievements obtained by each laboratory. The study used primary data that were collected using a checklist which referred to ISO 35001: 2019 on Laboratory Bio-risk Management. The checklist consisted of 202 items forming seven main elements. In addition, secondary data obtained from literature and document review were also used. The results show that out of 11 laboratories examined, only 2 laboratories met 50% of the requirements, which were Laboratory A and B, achieving good performance. Regarding the clauses of standards, a gap analysis identified leadership, performance evaluation, and support as elements with the lowest achievement. Therefore, corrective action should be developed by enhancing the commitment from management as well as improving documentation, policy, education and training.


Author(s):  
V. F. Bezjazychnyi ◽  
E. V. Kiselev ◽  
V. A. Troshkin

Improvement of modern management systems for industrial enterprises involves the active use of risk management methods that are accompanied by their activities. Issues of production risks and their place in the General enterprise management system are discussed in the article. There is a classification of the main production risks and possible risk management methods applicable in the activities of an industrial enterprise.


2000 ◽  
Vol 1 (3) ◽  
pp. 281-299 ◽  
Author(s):  
Stephan Paul

Abstract Banking regulation in the twenty-first century is at the crossroads. The article discusses the question whether the supervisory review of bank risk management systems is superior to the minimum capital requirements in traditional style. It points out the serious problems of both ways - especially the first one, which was preferred by the Basle Committee of Banking Supervision in its proposal ,,A new capital adequacy framework`` (June 1999).


Sign in / Sign up

Export Citation Format

Share Document