Improved cost monitoring and control through the Earned Value Management System

2014 ◽  
Vol 93 ◽  
pp. 497-500 ◽  
Author(s):  
Howard Hunter ◽  
Richard Fitzgerald ◽  
Dewey Barlow
2021 ◽  
pp. 1-14
Author(s):  
Seyed Taha Hossein Mortaji ◽  
Siamak Noori ◽  
Morteza Bagherpour

Earned value management is well-known as the most efficient method of project monitoring and control providing relatively reliable information about the project performance. However, this method requires accurate estimates of the progress of project activities, which are always associated with uncertainties that, if ignored or not addressed well, lead to incorrect results. To address this issue, the application of multi-valued logic, in particular fuzzy logic, in earned value management has recently attracted a lot of attention both in practice and research. This paper introduces directed earned value management (DEVM) in which ordered fuzzy numbers are used to express the so-called uncertainties as well as to capture more information about the trend of the project progress. To evaluate the performance of the proposed method, several numerical examples and a case study are presented. The results reveal that compared to the existing methods, DEVM has a lower computational complexity. Also, it doesn’t suffer from the overestimation effect and as a result, it has a higher ability to express project-specific dynamics. In sum, the proposed method allows project managers to make informed decisions that lead to taking preventive and corrective actions promptly and at a lower cost.


Author(s):  
Pablo Ballesteros-Pérez ◽  
Kamel Mohamed Elamrousy

A significant proportion of projects across the construction industry fail to meet their planned completion dates, being this a recurrent topic in the project management literature. Multiples causes of project delays have been proposed, however, hardly any attention has been paid to the fact that the most celebrated project monitoring and control technique – the Earned Value Management (EVM) – may not be as fit for purpose as it seems. It is proposed that because EVM ignores activity duration variability it always results in optimistic completion dates which may be very difficult to meet in the real projects. This research offers a fresh and long overdue critique of EVM in its most common implementation (assuming deterministic activity durations and costs), while highlighting its shortcomings. Particularly, Monte Carlo simulations are implemented to exemplify how the merge event bias phenomenon is inadvertently impacting the schedule in both time and cost dimensions. A fictitious case study is used to demonstrate the connection between these shortcomings and what is then conceived as a delay in project completion.


2014 ◽  
Vol 971-973 ◽  
pp. 2317-2320
Author(s):  
Xiang Jun Yu ◽  
Chao Xie ◽  
Tian Ming Huang

This paper briefly introduces the basic connotation of earned value management, determine, from the target variable management process design, system function design and system implementation four aspects that the management of defense scientific research project management system design and implementation process based on the earned value, and some reasonable countermeasures to promote the use of the system.