Scheduling identical jobs on uniform machines with a conflict graph

2019 ◽  
Vol 111 ◽  
pp. 357-366
Author(s):  
Amin Mallek ◽  
Mohamed Bendraouche ◽  
Mourad Boudhar
2017 ◽  
Vol 65 (1) ◽  
pp. 29-34 ◽  
Author(s):  
H. Furmańczyk ◽  
M. Kubale

Abstract In the paper we consider the problem of scheduling n identical jobs on 4 uniform machines with speeds s1 ≥ s2 ≥ s3 ≥ s4, respectively. Our aim is to find a schedule with a minimum possible length. We assume that jobs are subject to some kind of mutual exclusion constraints modeled by a bipartite incompatibility graph of degree Δ, where two incompatible jobs cannot be processed on the same machine. We show that the general problem is NP-hard even if s1 = s2 = s3. If, however, Δ ≤ 4 and s1 ≥ 12s2, s2 = s3 = s4, then the problem can be solved to optimality in time O(n1.5). The same algorithm returns a solution of value at most 2 times optimal provided that s1 ≥ 2s2. Finally, we study the case s1 ≥ s2 ≥ s3 = s4 and give a 32/15-approximation algorithm running also in O(n1.5) time.


Algorithmica ◽  
2021 ◽  
Author(s):  
Matthias Englert ◽  
David Mezlaf ◽  
Matthias Westermann

AbstractIn the classic minimum makespan scheduling problem, we are given an input sequence of n jobs with sizes. A scheduling algorithm has to assign the jobs to m parallel machines. The objective is to minimize the makespan, which is the time it takes until all jobs are processed. In this paper, we consider online scheduling algorithms without preemption. However, we allow the online algorithm to change the assignment of up to k jobs at the end for some limited number k. For m identical machines, Albers and Hellwig (Algorithmica 79(2):598–623, 2017) give tight bounds on the competitive ratio in this model. The precise ratio depends on, and increases with, m. It lies between 4/3 and $$\approx 1.4659$$ ≈ 1.4659 . They show that $$k = O(m)$$ k = O ( m ) is sufficient to achieve this bound and no $$k = o(n)$$ k = o ( n ) can result in a better bound. We study m uniform machines, i.e., machines with different speeds, and show that this setting is strictly harder. For sufficiently large m, there is a $$\delta = \varTheta (1)$$ δ = Θ ( 1 ) such that, for m machines with only two different machine speeds, no online algorithm can achieve a competitive ratio of less than $$1.4659 + \delta $$ 1.4659 + δ with $$k = o(n)$$ k = o ( n ) . We present a new algorithm for the uniform machine setting. Depending on the speeds of the machines, our scheduling algorithm achieves a competitive ratio that lies between 4/3 and $$\approx 1.7992$$ ≈ 1.7992 with $$k = O(m)$$ k = O ( m ) . We also show that $$k = \varOmega (m)$$ k = Ω ( m ) is necessary to achieve a competitive ratio below 2. Our algorithm is based on maintaining a specific imbalance with respect to the completion times of the machines, complemented by a bicriteria approximation algorithm that minimizes the makespan and maximizes the average completion time for certain sets of machines.


2014 ◽  
Vol 39 (1) ◽  
pp. 3-16 ◽  
Author(s):  
Enrique Gerstl ◽  
Gur Mosheiov ◽  
Assaf Sarig

Abstract We study a special two-stage flexible flowshop, which consists of several parallel identical machines in the first stage and a single machine in the second stage. We assume identical jobs, and the option of batching, with a required setup time prior to the processing of a new batch. We also consider the option to use only a subset of the available machines. The objective is minimum makespan. A unique optimal solution is introduced, containing the optimal number of machines to be used, the sequence of batch sizes, and the batch schedule. The running time of our proposed solution algorithm is independent of the number of jobs, and linear in the number of machines