scholarly journals Research of Coordinated Control Strategy for Multi-UHVDC in AC/DC Hybrid Power Grid

2011 ◽  
Vol 12 ◽  
pp. 443-449
Author(s):  
Shanmei Liu ◽  
Lijie Ding ◽  
Yiqun Miao
2015 ◽  
Vol 799-800 ◽  
pp. 1306-1310
Author(s):  
Fang Ming Niu ◽  
Peng Wang ◽  
Yu Cheng ◽  
Xue Dong Ren

The disadvantage of Beijing-Tianjin-Tangshan power grid operation control mode is that the control effect is poorer and the spare capacity demand is big, this paper puts forward a new coordinated control strategy. First of all, this paper describes the relationship between the load, frequency, the output of generating unit, the tie line power and the area control error relationship of the whole power grid, according to the regional automatic generation control performance assessment criteria, concludes the characteristics of regional unit adjustment. This paper analyzes the contradiction between them, and then proposes a coordinated control strategy between the Beijing-Tangshan power grid and Tianjin power grid. The case simulation results prove the superiority and feasibility of the new coordinated control strategy. Compared with the original, the new strategy reduces the volatility of the unit, shortens the recovery time of frequency, and has a certain practical significance.


Author(s):  
Fei Xia ◽  
Zongze Xia ◽  
Peixian Cong ◽  
Zhixiong Yang ◽  
Hanbiao Song ◽  
...  

Author(s):  
Wei-chun GE ◽  
Qi-li HUANG ◽  
Jian-xin ZHU ◽  
Jian-guo WANG ◽  
Qun CHEN ◽  
...  

Complexity ◽  
2021 ◽  
Vol 2021 ◽  
pp. 1-13
Author(s):  
Xiao-ling Su ◽  
Lai-jun Chen ◽  
Jun Yang ◽  
Zhengxi Li ◽  
Peng Zhou ◽  
...  

Power systems have developed significantly because of the increasing share of renewable energy sources (RESs). Despite the advantages, they also bring inevitable challenges to power system stability, especially under extreme fault conditions. This paper presents a practical active support control strategy for RESs to support the power grid under extreme fault conditions. The proof process is taken in an AC-DC hybrid power grid integrated with large capacity of PV stations and wind farms. The on-site engineering test results reflect that RESs bring potential risks in the AC-DC hybrid power grid operation and validate the excellent engineering practical features of the proposed control strategy. In addition, test results also reveal predisposing factors of power system instability which are missing in the simulation and fault simulation device-based testing results. They prove the outstanding advantages of on-site engineering tests.


Sign in / Sign up

Export Citation Format

Share Document