Attitudes of Hong Kong residents toward the Daya Bay nuclear power plant

Energy Policy ◽  
2013 ◽  
Vol 62 ◽  
pp. 1172-1186 ◽  
Author(s):  
William Chung ◽  
Iris M.H. Yeung
Radiocarbon ◽  
1995 ◽  
Vol 37 (2) ◽  
pp. 505-508 ◽  
Author(s):  
P. L. Leung ◽  
M. J. Stokes ◽  
S.H. Qiu ◽  
L. Z. Cai

As an industrialized city, Hong Kong annually consumes a large amount of fossil fuel. In addition, the Daya Bay Nuclear Power Plant in Shenzhen, Guangdong Province, has just begun operation 20 km from Hong Kong. These factors suggest that it may be appropriate and significant to examine the variation of atmospheric 14C levels in Hong Kong. We have collected and tested a variety of samples from different parts of Hong Kong: terrestrial annual grasses, marine plants and atmospheric CO2. We measured their 14C activity and compared it with that of cassia oil samples from Guangxi Province, China. The values obtained indicate that environmental 14C levels in the Hong Kong region agree with those found in Guangxi, both of which are significantly higher than the levels predicted by Povinec, Chudý and Šivo (1986).


2013 ◽  
Vol 39 ◽  
pp. 423-427
Author(s):  
Yongsheng Ling ◽  
Wenbao Jia ◽  
Qing Shan ◽  
Daqian Hei ◽  
Xingyu Wang ◽  
...  

2021 ◽  
Vol 252 ◽  
pp. 02075
Author(s):  
Yang Jie ◽  
Yuan Liang ◽  
Yang Wu ◽  
Qin Qiang

Daya Bay Nuclear Power Plant has been running for above 20 years. main condensers have begun to run during the commissioning phase before the official commercial operation, so it is imminent to carry out the life cycle management of main condensers combined with demonstration of the operation license extended to 60 years. A life cycle management system for main condensers in nuclear power plant is established in this paper, which is applied to management practices of Daya Bay Nuclear Power Plant.


Author(s):  
Li Yujian ◽  
Guo Zhenwu ◽  
Lu Min

In order to reserve a spare inner stator for the four generators in Daya Bay nuclear power base and solve several defects in Daya Bay unit 1, DNMC (Daya Bay Nuclear Power Operations And Management Co., Ltd.) bought a new inner stator with stainless steel water conducting coil bar and got the replacement work done on Daya Bay unit 1 during D117 outage in 2015. This paper describes the technological process and difficulties of the replacement work. As some of the domestic large capacity power generators are getting older, it will be used for reference.


2000 ◽  
Vol 48 (3) ◽  
pp. 265-277 ◽  
Author(s):  
J.Z Cao ◽  
M.R Yeung ◽  
S.K Wong ◽  
J Ehrhardt ◽  
K.N Yu

2014 ◽  
Vol 8 (6) ◽  
pp. 845-853 ◽  
Author(s):  
Jingyu Wang ◽  
Hongwei Fang ◽  
Guojian He ◽  
Lei Huang

Sign in / Sign up

Export Citation Format

Share Document