Joint optimal operation of photovoltaic units and electric vehicles in residential networks with storage systems: A dynamic scheduling method

Author(s):  
Carlos Sabillon ◽  
John F. Franco ◽  
Marcos J. Rider ◽  
Rubén Romero
2019 ◽  
Vol 2019 ◽  
pp. 1-15
Author(s):  
Jingtian Zhang ◽  
Fuxing Yang ◽  
Xun Weng

Robotic mobile fulfilment system (RMFS) is an efficient and flexible order picking system where robots ship the movable shelves with items to the picking stations. This innovative parts-to-picker system, known as Kiva system, is especially suited for e-commerce fulfilment centres and has been widely used in practice. However, there are lots of resource allocation problems in RMFS. The robots allocation problem of deciding which robot will be allocated to a delivery task has a significant impact on the productivity of the whole system. We model this problem as a resource-constrained project scheduling problem with transfer times (RCPSPTT) based on the accurate analysis of driving and delivering behaviour of robots. A dedicated serial schedule generation scheme and a genetic algorithm using building-blocks-based crossover (BBX) operator are proposed to solve this problem. The designed algorithm can be combined into a dynamic scheduling structure or used as the basis of calculation for other allocation problems. Experiment instances are generated based on the characteristics of RMFS, and the computation results show that the proposed algorithm outperforms the traditional rule-based scheduling method. The BBX operator is rapid and efficient which performs better than several classic and competitive crossover operators.


2009 ◽  
Vol 16-19 ◽  
pp. 743-747
Author(s):  
Yu Wu ◽  
Xin Cun Zhuang ◽  
Cong Xin Li

Solve the flexible dynamic scheduling problem by using “dynamic management & static scheduling” method. Aim at the property of flexible Manufacturing systems, the dynamic scheduling methods are analyzed and a coding method based on working procedure is improved in this paper. Thus it can be efficiently solve the problem of multiple working routes selection under the active distribution principle. On the other hand, the self-adaptive gene is provided and the parameters of the genetic algorithm are defined. In such a solution, the scheduling is confirmed to be simple and efficient.


2015 ◽  
Vol 16 (6) ◽  
pp. 579-589 ◽  
Author(s):  
Tsubasa Shimoji ◽  
Hayato Tahara ◽  
Hidehito Matayoshi ◽  
Atsushi Yona ◽  
Tomonobu Senjyu

Abstract From the perspective of global warming suppression and the depletion of energy resources, renewable energies, such as the solar collector (SC) and photovoltaic generation (PV), have been gaining attention in worldwide. Houses or buildings with PV and heat pumps (HPs) are recently being used in residential areas widely due to the time of use (TOU) electricity pricing scheme which is essentially inexpensive during middle-night and expensive during day-time. If fixed batteries and electric vehicles (EVs) can be introduced in the premises, the electricity cost would be even more reduced. While, if the occupants arbitrarily use these controllable loads respectively, power demand in residential buildings may fluctuate in the future. Thus, an optimal operation of controllable loads such as HPs, batteries and EV should be scheduled in the buildings in order to prevent power flow from fluctuating rapidly. This paper proposes an optimal scheduling method of controllable loads, and the purpose is not only the minimization of electricity cost for the consumers, but also suppression of fluctuation of power flow on the power supply side. Furthermore, a novel electricity pricing scheme is also suggested in this paper.


Sign in / Sign up

Export Citation Format

Share Document