Confirmation and Prevention of Vapor Bypass in Absorption Heat Pump with U-Pipe Pressure Separation Device Caused by Upward Side Two-phase Flow
Keyword(s):
Keyword(s):
2019 ◽
Vol 157
◽
pp. 113712
◽
Keyword(s):
Keyword(s):
2004 ◽
Vol 27
(6)
◽
pp. 629-638
◽
2005 ◽
Vol 28
(5)
◽
pp. 791
Keyword(s):
1982 ◽
Vol 104
(4)
◽
pp. 358-365
◽
Keyword(s):
2008 ◽
Vol 47
(11)
◽
pp. 1555-1562
◽
Keyword(s):
1989 ◽
Vol 12
(1)
◽
pp. 29-41
◽
Keyword(s):
Keyword(s):