Integrated CO2, cost, and schedule management system for building construction projects using the earned value management theory

2015 ◽  
Vol 103 ◽  
pp. 275-285 ◽  
Author(s):  
Jimin Kim ◽  
Choongwan Koo ◽  
Chan-Joong Kim ◽  
Taehoon Hong ◽  
Hyo Seon Park
Author(s):  
Mandiyo Priyo ◽  

Earned Value Management (EVM) is a methodology combining scope, schedule, and resource measurements to assess project performance and progress. It involves integrating the three critical elements of the project covering schedule, work scope, and cost. Various benefits are associated with the use of EVM in project management. This research aims to analyze four units of building construction projects using the EVM method consisting of an analysis of project performance, estimation of cost, and time for project completion, and planning estimation analysis against project completion. The results revealed that from the aspect of time, three buildings were completed ahead of schedule, and another one was behind schedule. In terms of cost, three buildings cost lower than the estimated budget, while one other building was higher.


2014 ◽  
Vol 971-973 ◽  
pp. 2317-2320
Author(s):  
Xiang Jun Yu ◽  
Chao Xie ◽  
Tian Ming Huang

This paper briefly introduces the basic connotation of earned value management, determine, from the target variable management process design, system function design and system implementation four aspects that the management of defense scientific research project management system design and implementation process based on the earned value, and some reasonable countermeasures to promote the use of the system.


Author(s):  
ibraheem Aidan ◽  
Firas Jaber ◽  
Duaa Al-Jeznawi ◽  
Faiq Al-Zwainy

The importance of this study may be defined by using the smart techniques to earned value indicators of residential buildings projects in Republic of Iraq, only one development intelligent forecasting model was presented to predict Schedule Performance Index (SPI), Cost Performance Index (CPI), and To Complete Cost Performance Indicator (TCPI) are defined as the dependent. The approach is principally influenced by the determining numerous factors which effect on the earned value management, that involves Iraqi historical data. In addition, six independent variables (F1: BAC, Budget at Completion., F2: AC, Actual Cost., F3, A%, Actual Percentage., F4: EV, Earned Value. F5: P%, Planning Percentage., and F6: PV, Planning Value) were arbitrarily designated and satisfactorily described for per construction project. It was found that ANN has the capability to envisage the dust storm with a great accuracy. The correlation coefficient (R) has been 90.00%, and typical accuracy percentage has been 89.00%.