Quantifying streamflow predictive uncertainty for the optimization of short-term cascade hydropower stations operations

2021 ◽  
pp. 127376
Author(s):  
Yuan Liu ◽  
Chang-ming Ji ◽  
Yi Wang ◽  
Yanke Zhang ◽  
Xianing Hou ◽  
...  
2018 ◽  
Vol 246 ◽  
pp. 01026
Author(s):  
Mo Li ◽  
Yongqiang Wang ◽  
Xinwen Gao ◽  
Shen Qin

With the succession of river basins and inter-basin hydropower stations, the joint optimal operation of cascade hydropower stations in the river basin has large-scale, nonlinear, strong coupling, and multi-target characteristics, and must consider the effects of hydrometeorology, water demand, and power grid security. Focusing on the preparation of short-term power generation plans for cascade hydropower stations on the Qingjiang River, a comprehensive multi-objetive power generation planning model with the largest total power generation and the least load variance on the power grid is established. Based on the constraint processing method of multi-objective optimization scheduling in long-term, the optimal flow distribution technology is adopted to improve the accuracy of power generation planning. The above model is solved by using SMPSO. The results show that the improved algorithm can effectively overcome the shortcomings of slow convergence speed and easy convergence to local optimum. It can improve the power generation efficiency of the whole cascade while responding to the peaking demand of the power grid and provide a new solution to the short-term power generation planning ideas.


2017 ◽  
Vol 549 ◽  
pp. 326-339 ◽  
Author(s):  
Liping Wang ◽  
Boquan Wang ◽  
Pu Zhang ◽  
Minghao Liu ◽  
Chuangang Li

IEEE Access ◽  
2020 ◽  
Vol 8 ◽  
pp. 226754-226772
Author(s):  
Trong-The Nguyen ◽  
Hong-Jiang Wang ◽  
Thi-Kien Dao ◽  
Jeng-Shyang Pan ◽  
Jian-Hua Liu ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document