A new hybrid heuristic algorithm for the Precedence Constrained Production Scheduling Problem: A mining application
2015 ◽
Vol 2015
◽
pp. 1-6
◽
2017 ◽
Vol 87
◽
pp. 165-182
◽
Keyword(s):
2019 ◽
Vol 30
(2)
◽
pp. 327
◽
Keyword(s):
A Hybrid Heuristic Algorithm for the Intelligent Transportation Scheduling Problem of the BRT System
2015 ◽
Vol 24
(4)
◽
pp. 437-448
◽
2016 ◽
2014 ◽
Vol 14
(2)
◽
pp. 69-77