scholarly journals Reconstruction and prediction of capillary pressure curve based on Particle Swarm Optimization-Back Propagation Neural Network method

Petroleum ◽  
2018 ◽  
Vol 4 (3) ◽  
pp. 268-280 ◽  
Author(s):  
Lijun You ◽  
Qigui Tan ◽  
Yili Kang ◽  
Chengyuan Xu ◽  
Chong Lin
2013 ◽  
Vol 333-335 ◽  
pp. 1384-1387
Author(s):  
Jin Jie Yao ◽  
Xiang Ju ◽  
Li Ming Wang ◽  
Jin Xiao Pan ◽  
Yan Han

Target localization technology has been intensively studied and broadly applied in many fields. This paper presents one improved particle swarm optimization technique in training a back-propagation neural network for position estimation in target localization. The proposed scheme combines particle swarm optimization (PSO), back-propagation neural network (BP), adaptive inertia weight and hybrid mutation, called IPSO-BP. To verify the proposed IPSO-BP approach, comparisons between the PSO-based BP approach (PSO-BP) and general back-propagation neural network (BP) are made. The computational results show that the proposed IPSO-BP approach exhibits much better performance in the training process and better prediction ability in the validation process than those using the other two base line approaches.


2018 ◽  
Vol 49 ◽  
pp. 02004 ◽  
Author(s):  
Gilang Almaghribi Sarkara Putra ◽  
Rendra Agus Triyono

Cost estimation on the bidding phase is a crucial stage that determines the success of the Engineering, Procurement and Construction (EPC) project. If the cost offered to the client is too high then it could not compete with the other bidder, but if the cost offered are too low it can reduce profit margins and result in losses for the EPC companies. This paper describe the use of Back Propagation Neural Network method to help determine cost estimation. This method is applied specifically to determine control valve cost estimation on the bidding phase so that the retrieved costs will be accurate. When there is no technical and price quotation from vendors as well as the narrowness of the bidding processing time, this method can be an alternative choice to determine the price based on previous vendor quotation. In the future, this method could be developed and applied for other instrumentation equipment such as transmitter, switch, analyzer, control system and others to achieve total cost estimation of instrumentation equipment in EPC bidding proposal.


Sign in / Sign up

Export Citation Format

Share Document