scholarly journals Generation expansion planning optimisation with renewable energy integration: A review

2017 ◽  
Vol 69 ◽  
pp. 790-803 ◽  
Author(s):  
Vishwamitra Oree ◽  
Sayed Z. Sayed Hassen ◽  
Peter J. Fleming
AIMS Energy ◽  
2019 ◽  
Vol 7 (4) ◽  
pp. 441-464 ◽  
Author(s):  
Abdul Matin Ibrahimi ◽  
◽  
Mohammad Masih Sediqi ◽  
Harun Or Rashid Howlader ◽  
Mir Sayed Shah Danish ◽  
...  

2021 ◽  
Vol 13 (18) ◽  
pp. 10477
Author(s):  
Tumiran ◽  
Lesnanto Multa Putranto ◽  
Roni Irnawan ◽  
Sarjiya ◽  
Adi Priyanto ◽  
...  

In order to meet the growth in demand and the renewable energy integration target, the Sulawesi Electricity System (SES) should be expanded. Currently, the SES is divided into two systems, namely South and North Sulawesi. These two systems have different characteristics, such as the system size, reliability and operational cost. North Sulawesi is smaller, weaker and more expensive than the South System. In order to improve the system reliability, generation and transmission expansion planning should be executed simultaneously to meet the economical investment cost and satisfy the reliability standard. For this purpose, the necessity of a backbone system with a higher voltage level than the existing 150 kV system should be considered, including the interconnection option between the two existing systems in Sulawesi. A methodology based on economic and technical criteria was developed to determine the backbone voltage level. Two voltage level options were considered, namely 275 and 500 kV. Several criteria were considered in order to determine the backbone voltage level, including the economic voltage, the line-loading limit, N-1 contingency, short circuiting, transient stability, voltage stability and small signal stability. The backbone voltage candidates should fulfil all of the criteria. The simulation was conducted in base- and high-demand scenarios, considering the fluctuation of future economic growth. The load flow and the dynamic analysis were simulated in a DIgSILENT Power Factory environment. The results showed that the 275 kV backbone, which was built in 2022, would violate three criteria: the economic voltage, N-1 contingency and voltage stability. On the other hand, the 500 kV backbone voltage level fulfills all of the criteria. The result of this research was considered in the electricity planning documents in Sulawesi. From a technical and economical perspective, the 500 kV backbone was chosen for the SES.


2020 ◽  
Vol 12 (3) ◽  
pp. 1083 ◽  
Author(s):  
Qingtao Li ◽  
Jianxue Wang ◽  
Yao Zhang ◽  
Yue Fan ◽  
Guojun Bao ◽  
...  

The increasing penetration of renewable energy brings great challenges to the planning and operation of power systems. To deal with the fluctuation of renewable energy, the main focus of current research is on incorporating the detailed operation constraints into generation expansion planning (GEP) models. In most studies, the traditional objective function of GEP is to minimize the total cost (including the investment and operation cost). However, in power systems with high penetration of renewable energy, more attention has been paid to increasing the utilization of renewable energy and reducing the renewable energy curtailment. Different from the traditional objective function, this paper proposes a new objective function to maximize the accommodation of renewable energy during the planning horizon, taking into account short-term operation constraints and uncertainties from load and renewable energy sources. A power grid of one province in China is modified as a case study to verify the rationality and effectiveness of the proposed model. Numerical results show that the proposed GEP model could install more renewable power plants and improve the accommodation of renewable energy compared to the traditional GEP model.