Ground movements due to the construction of cut-and-cover structures and slurry shield tunnel of the Cairo Metro

1999 ◽  
Vol 14 (3) ◽  
pp. 281-289 ◽  
Author(s):  
M. Hamza ◽  
A. Ata ◽  
A. Roussin
2021 ◽  
Vol 34 (2) ◽  
pp. 04020118
Author(s):  
Song Zhou ◽  
Guan-Lin Ye ◽  
Lei Han ◽  
Wang Jian-Hua

1999 ◽  
Vol 39 (3) ◽  
pp. 99-112 ◽  
Author(s):  
Tadashi Sugiyama ◽  
Toshiyuki Hagiwara ◽  
Toshi Nomoto ◽  
Masaaki Nomoto ◽  
Yutaka Ano ◽  
...  

Author(s):  
Xiaojun Zhou ◽  
Jin Wang ◽  
Hongyun Hu ◽  
Xiaofeng Wang
Keyword(s):  

2021 ◽  
Vol 35 (5) ◽  
pp. 04021068
Author(s):  
Daxin Geng ◽  
Yuchen Hu ◽  
Yalong Jiang ◽  
Ning Wang ◽  
Wentao Hu

2014 ◽  
Vol 919-921 ◽  
pp. 1104-1109
Author(s):  
Chen Rui Pang ◽  
Xin Wen

Waste soil progressing in shield tunnel construction should occupy large space, on the other hand, do harm to city environment. If the waste sand in silt and fine sand layer can be used as sand source of synchronous grouting, it will bring benefits for the enterprise and society. In indoor experiment, we select waste sand in different layers, sieved as sand source, then use the waste sand to produce slurry and compare their strength with the construction slurry’s. The study found, sieved waste sand in silt and fine sand layer can be used as sand source for making synchronous grouting slurry.


Author(s):  
Cong Zhang ◽  
Kui Chen ◽  
Junsheng Yang ◽  
Jinyang Fu ◽  
Shuying Wang ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document