Ground movements due to the construction of cut-and-cover structures and slurry shield tunnel of the Cairo Metro
1999 ◽
Vol 14
(3)
◽
pp. 281-289
◽
2021 ◽
Vol 34
(2)
◽
pp. 04020118
2021 ◽
Vol 35
(5)
◽
pp. 04021068
2014 ◽
Vol 919-921
◽
pp. 1104-1109
Keyword(s):
2020 ◽
Vol 114
◽
pp. 103173
◽
Keyword(s):
2013 ◽
Vol 15
(4)
◽
pp. 401
◽