Bridge construction

AccessScience ◽  
2015 ◽  
Keyword(s):  
PCI Journal ◽  
2012 ◽  
Vol 57 (4) ◽  
pp. 34-49 ◽  
Author(s):  
Bijan Khaleghi ◽  
Eric Schultz ◽  
Stephen Seguirant ◽  
Lee Marsh ◽  
Olafur Haraldsson ◽  
...  

Author(s):  
Jure Radić ◽  
Zlatko Šavor ◽  
Igor Gukov

2018 ◽  
Vol 49 ◽  
pp. 02020
Author(s):  
Hery Suliantoro ◽  
Nurul Fitriani ◽  
Bagus Hario Setiadji

Risk is a condition caused by uncertainty. Risks will occur on any construction project, including bridge construction projects. Efforts that can be taken to minimize the impact of these risks are to engage in risk management activities. This research was conducted on bridge construction work on toll road procurement project in Pejagan-Pemalang, Pemalang-Batang and Salatiga-Kertasura. The purpose of this research is to analyze the risk of bridge development project in toll road project using Risk Breakdown Structure (RBS) method and then the result as database in discussing risk response strategy. The bridge construction project has 36 risks that are divided into six groups: materials and equipment, design, human resources, finance, management, nature and environmental conditions. Bad weather risks are the higest risk and seasonal risk causing temporary work stoppages. This risk-response strategy is avoidance. Short-term avoidance response strategy is to add shift workers, install tents and add additives in the acceleration of the process of maturation of concrete. The long-term avoidance response strategy is to evaluate and rearrange the work schedule by considering the weather forecast report.


Sign in / Sign up

Export Citation Format

Share Document