scholarly journals Research on Application Strategy of EPC Mode Based on BIM Technology in Cost Management of Military Readiness Engineering

2021 ◽  
Vol 251 ◽  
pp. 03093
Author(s):  
Li Kai ◽  
Jiang Guo-ping

Based on the current status of military combat readiness project cost management, this article analyzes the necessity of introducing EPC mode and BIM technology into military combat readiness project cost management and the problems existing in the application process, and proposes the EPC mode based on BIM technology in the military combat readiness project cost management The operational mechanism conception, confidentiality management, risk management and other response strategies provide reference for the reform of the military combat readiness project cost management model.

2009 ◽  
Vol 24 (1) ◽  
pp. 3-8 ◽  
Author(s):  
Richard Malish ◽  
David E. Oliver ◽  
Robert M. Rush ◽  
Esmeraldo Zarzabal ◽  
Michael J. Sigmon ◽  
...  

AbstractThe August 2007 earthquake in Peru resulted in the loss of critical health infrastructure and resource capacity. A regionally located United States Military Mobile Surgical Team was deployed and operational within 48 hours. However, a post-mission analysis confirmed a low yield from the military surgical resource. The experience of the team suggests that non-surgical medical, transportation, and logistical resources filled essential gaps in health assessment, evacuation, and essential primary care in an otherwise resource-poor surge response capability. Due to an absence of outcomes data, the true effect of the mission on population health remains unknown. Militaries should focus their disaster response efforts on employment of logistics, primary medical care, and transportation/evacuation. Future response strategies should be evidence-based and incorporate a means of quantifying outcomes.


2014 ◽  
Vol 687-691 ◽  
pp. 1979-1982
Author(s):  
Chun Jin ◽  
Yun Bai

At present, the application of project cost management information system has become a trend. The development of project cost management information system in our country is relatively later. Because project cost management information system is lack of unified network, imperfect system module, lower personal qualities, and so on, it does not play proper role. The article analyzes construction of project cost management information system from overall design and puts forward the corresponding countermeasures and suggestions.


2018 ◽  
pp. 81-105
Author(s):  
Ginger Levin
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document