2018 ◽  
Vol 31 (3) ◽  
pp. 749-765 ◽  
Author(s):  
Yakup Çelikbilek

Purpose Evaluations of grey systems and systems with subjective judgements are always like an impasse for science and companies. Especially, calculations of the problems which include various units are really difficult situations. The purpose of this paper is to propose a grey analytic hierarchy process (G-AHP) for engineering and managerial problems with grey systems to make more clear and objective decisions. Design/methodology/approach Proposed G-AHP approach is applied to project manager selection for a software project of an energy company. The application includes three different units as year, score and assessment. Six engineers are evaluated with 25 criteria in the application. Weights of the factors and assessments are done by three top managers of the company as pairwise comparisons. Other data in the decision matrix are obtained from the personal information and exam results of engineers. Findings Final weights of the criteria and evaluations of engineers are all done with the proposed G-AHP. Obtained results of G-AHP are also compared with grey “VlseKriterijumska Optimizacija I Kompromisno Resenje” results as a validation of the calculations and proposed approach. Final results of the applications are ranked for the evaluations and comparison. All results of the case study are concluded with the effectiveness and applicability of the proposed G-AHP method both for this study and other fields of science, engineering and management. Originality/value This study provides to evaluate and interpret grey systems with different units and subjective judgements for science, engineering and management more clearly and objectively in an easier way.


2018 ◽  
Vol 35 (6) ◽  
pp. 1177-1194
Author(s):  
Keshav Kumar Sharma ◽  
Anup Kumar

PurposeThe purpose of this paper is to develop criteria for project manager selection based on desired skills of a project manager and facilitate the selection of a suitable candidate from a pool of potential candidates for the implementation of projects in the Indian context.Design/methodology/approachThe study utilizes three major skills, namely human skill, conceptual and organizational skills; technical skill along with their sub-skills to develop criteria for project manager selection. Based on the responses of project professionals from industry, the study uses analytical hierarchy process to prioritize and identify the relative importance of different skills in the criteria in order to develop a hierarchical structure for project manager selection.FindingsThe study finds that at the first level of project manager selection criteria, conceptual and organizational skills are the most important selection criteria followed by human skills and technical skills. At the second level of project manager selection criteria, planning, delegating authority and understanding methods, processes, and procedures are some of the important sub-selection criteria. The weights indicating the relative importance of major selection criteria and sub-selection criteria can be used to evaluate the relative weight of a given candidate for selection as a project manager.Research limitations/implicationsThe results in this study are derived from specific demographic conditions in India. Future research with larger samples from other countries is needed for generalizations of the proposed criteria.Practical implicationsThe proposed method quantifies the intangible qualitative criteria to select a project manager, which can aid decision-makers in a multi-criteria decision-making environment.Originality/valueThis research paper is focused on the identification of critical skills for the selection of a project manager, which is almost neglected by the researchers.


2019 ◽  
Vol 25 (3) ◽  
pp. 47-58
Author(s):  
Batur Bicer ◽  
Ryan Brauchler ◽  
Serhan Secmen ◽  
Maggie MJ Wang
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document