Change Orders and Schedule Performance of Design-Build Infrastructure Projects: Comparison between Highway and Water and Wastewater Projects

Author(s):  
Medya Fathi ◽  
Pramen P. Shrestha ◽  
Binita Shakya
2022 ◽  

This user’s guide covers the Standard Bidding Document for the Procurement of Design–Build–Operate Contracts for Water and Wastewater Greenfield Infrastructure Projects using a single-stage: two-envelope or a two-stage bidding procedure.


Author(s):  
Brian Lines ◽  
Anthony Perrenoud ◽  
Kenneth Sullivan

Performance in the construction industry is wrought with challenges and owners often are victim to cost and schedule overruns, particularly on high profile projects that are large, complex, and risky. Alternative project delivery methods and techniques are continually being developed and implemented by buyers of construction services to address these problems. The Best Value Business Model (BVBM) has been rigorously tested and shown to improve project performance via its three-phased approach to project delivery. BVBM increases performance throughout the construction project lifecycle by utilizing value-based selection processes, pre-contract planning methodologies, and performance measurement systems. The objective of this research is to provide a detailed case study of BVBM application on a design-build project to deliver a highly complex research facility with tight schedule and budget thresholds. The implementation process is discussed in detail and project results are provided and analyzed to demonstrate the ability of BVBM to improve project performance. Special attention is paid to the ability of BVBM to optimize project cost and schedule performance through the application of a value-based selection methodology, a pre-contract preplanning period, and a weekly risk management system.


2019 ◽  
Vol 4 (2) ◽  
pp. 14 ◽  
Author(s):  
Mohammadreza Habibi ◽  
Sharareh Kermanshachi ◽  
Behzad Rouhanizadeh

Delay and cost overrun in construction projects are two widespread problems that arouse practitioners’ and scholars’ concern. Therefore, the objective of this study was to identify Key Performance Indicators (KPIs) in each of Engineering, Procurement and Construction (EPC) phases separately and then calculate the weight impact that is associated with each of identified KPIs. Additionally, this study aimed to find the most appropriate Best Practices (BPs) for the identified phase-based indicators. Through a review of existing literature, a survey was developed to collect data from the completed construction projects. Various statistical methods, including two sample T-test and Kruskal-Wallis test, were utilized to analyze the data. Subsequently, Epsilon-Squared effect size method was applied to prioritize the identified KPIs. Since the lack of communication and slowness in decision making were found as the primary schedule Performance Indicators, schedule performance was identified to be highly affected by managerial approaches and actions. In addition, clients play a decisive role, because owner-driven change orders were found as the most crucial cost performance indicator affecting the performance of the engineering and construction phases. The outcome of this study helps practitioners and scholars to understand the phase-based cost and schedule KPIs, and appropriate mitigating strategies to improve the construction performance in EPC phases and save time and money.