Automatic Look-Ahead Schedule Generation System for the Finishing Phase of Complex Projects for General Contractors

Author(s):  
N. Dong ◽  
M. Fischer ◽  
Z. Haddad
2021 ◽  
Vol 2021 ◽  
pp. 1-14
Author(s):  
Jie Yang ◽  
Qian Cheng

Relational governance is generally concerned with the framework of project governance. However, this governance still has its limitations, which vary depending on contextual factors. Using transaction cost economics theory, this study considers project complexity as the moderator in studying the influence of trust as the most representative factor of relational governance in project performance. Empirical analysis with 302 owners and general contractors as a sample reveals that trust can effectively improve project performance and has a negative correlation with opportunism. The influence path of “trust–opportunism–project performance” is emphasized. The test of moderating effects shows that high project complexity increases the governance effectiveness of competence-based trust on project performance but weakens the governance effectiveness of goodwill-based trust on project performance. At the same time, high project complexity increases the governance effectiveness of goodwill-based trust on opportunism but weakens the governance effectiveness of competence-based trust on opportunism. The conclusion of this work can be used as a reference for the rational application of relational governance factors to various complex projects. This research also provides important inspiration for selecting appropriate relational governance directions to enhance project performance.


Buildings ◽  
2019 ◽  
Vol 9 (8) ◽  
pp. 175 ◽  
Author(s):  
Svetlana Olbina ◽  
Jonathan W. Elliott

Researchers have explored Building Information Modeling (BIM) utilization on complex buildings. However, limited research has been conducted investigating BIM implementation on simple projects. This study explored the perceptions of Architects, General Contractors and Owners regarding the project characteristics that impact successful BIM implementation, and the realized benefits thereof, on complex commercial buildings versus parking garages. A survey comprised of the project characteristics and realized benefits of BIM implementation identified by Dodge Data & Analytics was distributed. Exploratory Factor Analysis was conducted to identify the empirical groupings of successful BIM implementation characteristics and realized benefits thereof. Factor means were calculated and compared using ANOVA and t-tests. Statistical comparisons revealed no significant differences by building type. For project stakeholders, a significant difference was only observed on owner’s mean perceptions of technology-related characteristics when compared to architects. Previous research indicates that Architecture, Engineering, and Construction (AEC) stakeholders believe BIM is beneficial for large and complex projects. With the exception of technology-related project characteristics, findings reveal no statistical differences for project characteristics impacting successful BIM utilization or the realized benefits of BIM implementation given building type. This finding provides empirical evidence that various stakeholder groups view BIM as a universal AEC process that provides benefits on both complex and simple projects.


2016 ◽  
Vol 15 (1) ◽  
pp. 1-3
Author(s):  
Bernd Marcus
Keyword(s):  

1962 ◽  
Vol 08 (03) ◽  
pp. 485-501
Author(s):  
M. J Cross

Summary1. Plasma thromboplastin has been formed from a mixture of pigs’ plasma, serum and platelets using a modification of the thromboplastin generation system of Biggs and Douglas (1953). The thromboplastic activity in the modified system was more stable than in the original system.2. A sediment with considerable thromboplastic activity has been obtained by centrifugation. This sediment was free of platelets and contained very little thrombin.3. The sediment when resuspended in buffer was fully active only in the presence of calcium and between pH 6.6 and 7.0. The activity slowly decreased at 0—4° C and rapidly at 65° C.4. The sediment rapidly converted prothrombin to thrombin in the absence of factor V.5. The activity of the sediment was unaffected when it was incubated with thrombin.


2020 ◽  
pp. 99-111
Author(s):  
Vontas Alfenny Nahan ◽  
Audrius Bagdanavicius ◽  
Andrew McMullan

In this study a new multi-generation system which generates power (electricity), thermal energy (heating and cooling) and ash for agricultural needs has been developed and analysed. The system consists of a Biomass Integrated Gasification Combined Cycle (BIGCC) and an absorption chiller system. The system generates about 3.4 MW electricity, 4.9 MW of heat, 88 kW of cooling and 90 kg/h of ash. The multi-generation system has been modelled using Cycle Tempo and EES. Energy, exergy and exergoeconomic analysis of this system had been conducted and exergy costs have been calculated. The exergoeconomic study shows that gasifier, combustor, and Heat Recovery Steam Generator are the main components where the total cost rates are the highest. Exergoeconomic variables such as relative cost difference (r) and exergoeconomic factor (f) have also been calculated. Exergoeconomic factor of evaporator, combustor and condenser are 1.3%, 0.7% and 0.9%, respectively, which is considered very low, indicates that the capital cost rates are much lower than the exergy destruction cost rates. It implies that the improvement of these components could be achieved by increasing the capital investment. The exergy cost of electricity produced in the gas turbine and steam turbine is 0.1050 £/kWh and 0.1627 £/kWh, respectively. The cost of ash is 0.0031 £/kg. In some Asian countries, such as Indonesia, ash could be used as fertilizer for agriculture. Heat exergy cost is 0.0619 £/kWh for gasifier and 0.3972 £/kWh for condenser in the BIGCC system. In the AC system, the exergy cost of the heat in the condenser and absorber is about 0.2956 £/kWh and 0.5636 £/kWh, respectively. The exergy cost of cooling in the AC system is 0.4706 £/kWh. This study shows that exergoeconomic analysis is powerful tool for assessing the costs of products.


1943 ◽  
Vol 12 (23) ◽  
pp. 230-231
Author(s):  
Guenther Stein
Keyword(s):  

2019 ◽  
Vol 139 (3) ◽  
pp. 247-258
Author(s):  
L Ernesto Dominguez-Rios ◽  
Takayoshi Kitamura ◽  
Tomoko Izumi ◽  
Yoshio Nakatani

2005 ◽  
Vol 125 (11) ◽  
pp. 1016-1021 ◽  
Author(s):  
Yoshihisa Sato ◽  
Naotsugu Yoshida ◽  
Ryuichi Shimada

Sign in / Sign up

Export Citation Format

Share Document