Evolution of the Dragload Behavior during Construction of Four H-Piles with Different Top Load and End Fixity Conditions at a Bridge Abutment with Embankment Fill

IFCEE 2021 ◽  
2021 ◽  
Author(s):  
Derrick D. Dasenbrock ◽  
Liang Chern Chow ◽  
Derek S. Van Heuveln
Keyword(s):  
2017 ◽  
Vol 45 (3) ◽  
pp. 227-236 ◽  
Author(s):  
F. Schnaid ◽  
D. Winter ◽  
A.E.F. Silva ◽  
D. Alexiew ◽  
V. Küster

2016 ◽  
Vol 28 (1) ◽  
pp. 32-40 ◽  
Author(s):  
Y. Abdallah Mohamed ◽  
G. Mohamed Abdel-Aal ◽  
T. Hemdan Nasr-Allah ◽  
Awad A. Shawky

2014 ◽  
Vol 716-717 ◽  
pp. 342-346
Author(s):  
Xiao Jun Zhou ◽  
Bo Jiang ◽  
Yue Feng Zhou ◽  
Yu Yu

On the basis of different landform and multifarious topography in rugged mountainous area in southwest China, typical tunnel portals for single track tunnels in a new high speed railway line have been presented in the paper. The portal comprises headwall, shed tunnel, bridge abutment and its support. Portal with headwall is suitable for tunnel to resist front earth pressure on high and abrupt slope. Shed tunnel is placed in front of headwall so as to prevent rockfall; its outward part is built into a flared one. Meanwhile, the installation of bridge and its abutment are also included in the portal according to landform in the paper.


Sign in / Sign up

Export Citation Format

Share Document