Physical progress analysis of structure works using earned value management integrated with artificial neural network

2021 ◽  
Author(s):  
Muhammad Farhan ◽  
Apif Miptahul Hajji ◽  
Aisyah Larasati
2021 ◽  
Vol 7 (3) ◽  
pp. 461-476
Author(s):  
Salah J. Mohammed ◽  
Hesham A. Abdel-khalek ◽  
Sherif M. Hafez

Application Earned Value Management (EVM) as a construction project control technique is not very common in the Republic of Iraq, in spite of the benefit from EVA to the schedule control and cost control of construction projects. One of the goals of the present study is the employment machine intelligence techniques in the estimation of earned value; also this study contributes to extend the cognitive content of study fields associated with the earned value, and the results of this study are considered a robust incentive to try and do complementary studies, or to simulate a similar study in alternative new technologies. This paper is aiming at introducing a novel and alternative method of applying Artificial Intelligence Techniques (AIT) for earned value management of the construction projects through using Artificial Neural Networks (ANN) to build mathematical models to be used to estimate the Schedule Performance Index (SPI), Cost Performance Index (CPI) and to Complete Cost Performance Indicator (TCPI) in Iraqi residential buildings before and at execution stage through using web-based software to perform the calculations in the estimation quickly, accurately and without effort. ANN technique was utilized to produce new prediction models by applying the Backpropagation algorithm through Neuframe software. Finally, the results showed that the ANN technique shows excellent results of estimation when it is compared with MLR techniques. The results were interpreted in terms of Average Accuracy (AA%) equal to 83.09, 90.83, and 82.88%, also, correlation coefficient (R) equal to 90.95, 93.00, and 92.30% for SPI, CPI and TCPI respectively. Doi: 10.28991/cej-2021-03091666 Full Text: PDF


Symmetry ◽  
2020 ◽  
Vol 12 (10) ◽  
pp. 1745
Author(s):  
Amirhossein Balali ◽  
Alireza Valipour ◽  
Jurgita Antucheviciene ◽  
Jonas Šaparauskas

The cost, time and scope of a construction project are key parameters for its success. Thus, predicting these indices is indispensable. Correct and accurate prediction of cost throughout the progress of a project gives project managers the chance to identify projects that need revision in their schedules in order to result in the maximum benefit. The aim of this study is to minimize the shortcomings of the Earned Value Management (EVM) method using an Artificial Neural Network (ANN) and multiple regression analysis in order to predict project cost indices more precisely. A total of 50 road construction projects in Fars Province, Iran, were selected for analysis in this research. An ANN model was used to predict the projects’ cost performance indices, thereby creating a more accurate symmetry between the predicted and actual cost by considering factors that influence project success. The input data of the ANN model were analysed in MATLAB software. A multiple regression model was also used as another analytical tool to validate the outcome of the ANN. The results showed that the ANN model resulted in a lower Mean Squared Error (MSE) and a greater correlation coefficient than both the traditional EVM model and the multiple regression model.


2000 ◽  
Vol 25 (4) ◽  
pp. 325-325
Author(s):  
J.L.N. Roodenburg ◽  
H.J. Van Staveren ◽  
N.L.P. Van Veen ◽  
O.C. Speelman ◽  
J.M. Nauta ◽  
...  

2004 ◽  
Vol 171 (4S) ◽  
pp. 502-503
Author(s):  
Mohamed A. Gomha ◽  
Khaled Z. Sheir ◽  
Saeed Showky ◽  
Khaled Madbouly ◽  
Emad Elsobky ◽  
...  

1998 ◽  
Vol 49 (7) ◽  
pp. 717-722 ◽  
Author(s):  
M C M de Carvalho ◽  
M S Dougherty ◽  
A S Fowkes ◽  
M R Wardman

Sign in / Sign up

Export Citation Format

Share Document