The two-stage assembly scheduling problem is widely used in industrial and service industries. This study focuses on the two-stage three-machine flow shop assembly problem mixed with a controllable number and sum-of-processing times-based learning effect, in which the job processing time is considered to be a function of the control of the truncation parameters and learning based on the sum of the processing time. However, the truncation function is very limited in the two-stage flow shop assembly scheduling settings. Thus, this study explores a two-stage three-machine flow shop assembly problem with truncated learning to minimize the makespan criterion. To solve the proposed model, we derive several dominance rules, lemmas, and lower bounds applied in the branch-and-bound method. On the other hand, three simulated annealing algorithms are proposed for finding approximate solutions. In both the small and large size number of job situations, the SA algorithm is better than the JS algorithm in this study. All the experimental results of the proposed algorithm are presented on small and large job sizes, respectively.


2011 ◽  
Vol 268-270 ◽  
pp. 476-481
Author(s):  
Li Gao ◽  
Ke Lin Xu ◽  
Wei Zhu ◽  
Na Na Yang

A mathematical model was constructed with two objectives. A two-stage hybrid algorithm was developed for solving this problem. At first, the man-hour optimization based on genetic algorithm and dynamic programming method, the model decomposes the flow shop into two layers: sub-layer and patrilineal layer. On the basis of the man-hour optimization,A simulated annealing genetic algorithm was proposed to optimize the sequence of operations. A new selection procedure was proposed and hybrid crossover operators and mutation operators were adopted. A benchmark problem solving result indicates that the proposed algorithm is effective.


2014 ◽  
Vol 39 (1) ◽  
pp. 3-16 ◽  
Author(s):  
Enrique Gerstl ◽  
Gur Mosheiov ◽  
Assaf Sarig

Abstract We study a special two-stage flexible flowshop, which consists of several parallel identical machines in the first stage and a single machine in the second stage. We assume identical jobs, and the option of batching, with a required setup time prior to the processing of a new batch. We also consider the option to use only a subset of the available machines. The objective is minimum makespan. A unique optimal solution is introduced, containing the optimal number of machines to be used, the sequence of batch sizes, and the batch schedule. The running time of our proposed solution algorithm is independent of the number of jobs, and linear in the number of machines


2013 ◽  
Vol 651 ◽  
pp. 548-552
Author(s):  
Parinya Kaweegitbundit

This paper considers two stage hybrid flow shop (HFS) with identical parallel machine. The objectives is to determine makespan have been minimized. This paper presented memetic algorithm procedure to solve two stage HFS problems. To evaluated performance of propose method, the results have been compared with two meta-heuristic, genetic algorithm, simulated annealing. The experimental results show that propose method is more effective and efficient than genetic algorithm and simulated annealing to solve two stage HFS scheduling problems.