scholarly journals Crack Control Technology of SPMT Transportation Structure of Long-span and Special-shaped Concrete Box Girder

2021 ◽  
Vol 768 (1) ◽  
pp. 012058
Author(s):  
Wenhuo Sun ◽  
Pingjie Li ◽  
Kehao Zhang ◽  
Ming Tang
2012 ◽  
Vol 256-259 ◽  
pp. 1635-1639
Author(s):  
Cun Ren Jiang ◽  
Jian Min Ren ◽  
Zhuo Ling Wang

When stimulate temperature field of concrete box girder caused by solar radiation with ANSYS, it’s feasible to turn boundary conditions to third boundary condition. Taking Ping'an Huangshui River Super-large Bridge in Qinghai Province for example, the research analyzes box girder temperature field distribution and deduces realistic temperature gradient mode by comparing calculations with measurements. Calculations show that bottom slab of box girder also has quite big temperature gradient which should be taken seriously in bridge structure design.


2013 ◽  
Vol 443 ◽  
pp. 303-307
Author(s):  
Li Cai Zhao

In the Xiamen-Shenzhen Railway 32 m-span prestressed concrete box girder construction process, concrete box girder cracks always confused engineering and technical personnel, is a common and more difficult to solve quality problems, for box girder concrete surface cracks issues were discussed, and put forward a repair program to be applied in construction practice.


Sign in / Sign up

Export Citation Format

Share Document