Research and Implementation of Railway Freight Train Attitude and Center of Gravity Monitoring System

Author(s):  
Tianbai Zhang ◽  
Yin Zou ◽  
Yuntong An ◽  
Wanlu Yang ◽  
XinYi Li
Author(s):  
Dong yong Kwak ◽  
Hanbyeog Cho ◽  
Hyun seo Oh ◽  
Chi-hoon Jun ◽  
Ju-hun Park

2016 ◽  
Vol 5 ◽  
pp. 12 ◽  
Author(s):  
Michal Drábek ◽  
Vít Janoš ◽  
Zdeněk Michl

Regulation (EU) No 1315/2013 defines actual scope of core and comprehensive TEN-T network, including both networks for railway freight transport. For the core network, possibility to operate 740 m long freight trains is required. The aim of this paper is to analyse availability of appropriate overtaking tracks for 740 m long freight trains. Due to ETCS braking curves and odometry, such trains, after ETCS implementation, will require 780-800 m long overtaking tracks. For practical reasons (e.g. bypass lines), whole Czech railway TEN-T network is analysed. The overtaking track, whose occupation means influence on scheduled traffic or threat to boarding passengers, are excluded. The data was collected from station schemes from Collection of Official Requisites for 2015/16 Timetable, issued by SŽDC, Czech state Infrastructure Manager. Most of appropriate tracks are over 800 m long, but their density in the network and in particular directions varies considerably. For freight traffic, gradient of the line is important, so in the resulting figure, there are marked significant peaks for particular lines as well. Czech TEN-T lines are further segmented on the basis of number of tracks and their traffic character. Then, specific issues on overtaking or crossing of 740 m long freight trains are discussed. As a conclusion, for long-term development of Czech TEN-T lines, targeted investment is recommended not only for passenger railway, but also for freight railway. An attractive capacity offer for railway undertakings, which can stimulate freight traffic on European Rail freight corridors, can be represented by network-bound periodic freight train paths with suitable long overtaking tracks outside bottlenecks. After the overtaking by passenger trains, a freight train should run without stop through large node station or a bottleneck area. Before the sections with high gradients, coupling of additional locomotives should be connected with the overtaking process. Next suitable overtaking tracks should be available behind every significant peak of the line.


Author(s):  
Susanne Roesner ◽  
Heinrich Küfner
Keyword(s):  

<span class="fett">Hintergrund und Zielsetzung:</span> PHAR-MON ist ein Monitoring-System, das die auf dem deutschen Markt befindlichen Arzneimittel in ihrer Bedeutung für die Entwicklung von Missbrauch und Abhängigkeit in Suchtberatungsstellen überwacht. </p><p> <span class="fett">Methodik:</span> Klienten ambulanter Beratungsstellen werden im Rahmen der Standarddokumentation zu ihrem Arzneimittelkonsum befragt und Fälle eines abhängigen Konsums, eines schädlichen Gebrauchs oder eines Missbrauchs in PHAR-MON dokumentiert. </p><p> <span class="fett">Ergebnisse:</span> Im Jahr 2006 wurden insgesamt 448 Meldungen von 276 überwiegend alkohol- und drogenabhängigen Klienten in das Monitoring einbezogen. Tranquilizer vom Benzodiazepin-Typ wurden in allen Klientengruppen mit Anteilen zwischen 29,1 % und 35,3 % am häufigsten dokumentiert. An benzodiazepinabhängige Klienten werden zunehmend auch Nicht-Benzodiazepin-Hypnotika verordnet. Bei opioidabhängigen Klienten war im Zeitraum der letzten fünf Jahre ein Anstieg im missbräuchlichen Substitutionsmittelkonsum von 14,9 % auf 33,8 % zu verzeichnen. </p><p> <span class="fett">Schlussfolgerungen:</span> Das Risiko gefährlicher Wechselwirkungen zwischen Arzneimitteln mit Alkohol und Drogen sollte stärker als bisher in die ärztliche Verordnungsentscheidung einbezogen werden.


Sign in / Sign up

Export Citation Format

Share Document