Optimal stable real-time scheduling of a flexible manufacturing system modelled as a switched server system
1998 ◽
Vol 36
(9)
◽
pp. 2609-2626
◽
1994 ◽
Vol 13
(2)
◽
pp. 85-93
◽
1989 ◽
Vol 23
(4)
◽
pp. 355-374
◽
Keyword(s):
2000 ◽
Vol 2000.75
(0)
◽
pp. _13-23_-_13-24_
2006 ◽
Vol 2006
(0)
◽
pp. 21-22
◽
Keyword(s):