Preliminary design of underwater unmanned vehicle integrated System Evaluation

Author(s):  
Cai Cheng-Qi ◽  
Yang Song-Lin
Author(s):  
K. Sarabchi ◽  
G. T. Polley

The important and well-established performance criteria for assessment of a gas turbine cogeneration plant (GTCP) were examined. It was found that expressions could be derived for these criteria in terms of two key parameters: work efficiency and boiler efficiency. Three characteristics charts were then constructed. These covered gas turbine analysis, boiler analysis and GTCP performance analysis respectively. It is then demonstrated how these charts may be used as an effective tool for both performance prediction and preliminary design analysis. Thermodynamic design of a GTCP as an integrated system is also investigated and discussed.


Sign in / Sign up

Export Citation Format

Share Document