The design of parallel coal-mine drainage system

Author(s):  
Zhang Huihui ◽  
Qian Hongqi ◽  
Zhen Yu
2014 ◽  
Vol 1049-1050 ◽  
pp. 1038-1041
Author(s):  
Zhang Meng ◽  
Tao Zhu Feng ◽  
Guo Feng

The coal mine drainage equip ment plays an important role to make the production normally and orderly. At present, domestic coal mine drainage system implement manual monitoring, namely the traditional relay control method.Feature of this method is that a large labor intensity, low reliability and stability,and complicated control circuit,it has not adapted to the needs of the development of coal.In this paper, design of the automatic drainage system is to make up for the shortage of the traditional relay control,it adopts PLC control with a combination of PC monitor to improve the safety of the work,and has a long service life, convenient maintenance, etc.


2005 ◽  
Vol 137 (2) ◽  
pp. 295-304 ◽  
Author(s):  
Barnaby J. Watten ◽  
Philip L. Sibrell ◽  
Michael F. Schwartz

2019 ◽  
Vol 97 (11) ◽  
pp. 2920-2927
Author(s):  
Solange Kazue Utimura ◽  
Santiago Justo Arevalo ◽  
Carlos Gonzalo Alvarez Rosario ◽  
Mauro Quiñones Aguilar ◽  
Jorge Alberto Soares Tenório ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document