Resource Constrained Project Proactive Scheduling to Minimize Uncertainty Cost Considering Information handling

Author(s):  
Xiao Cui ◽  
Zhengwen He ◽  
Nengming Wang
2013 ◽  
Vol 61 (4) ◽  
pp. 1005-1015 ◽  
Author(s):  
M. Klimek ◽  
P. Łebkowski

Abstract The paper presents the resource-constrained project scheduling with cash flow optimisation. New project models with bonuspenalty system and payoff in stages have been proposed. For the models presented, the application of proactive scheduling is analysed, as designed to improve project execution under uncertainty. Next, schedule robustness is discussed and measures of robustness are proposed.