Two-Stage Optimization of Battery Energy Storage Capacity to Decrease Wind Power Curtailment in Grid-Connected Wind Farms
2018 ◽
Vol 33
(3)
◽
pp. 3296-3305
◽
Keyword(s):
2015 ◽
Vol 127
◽
pp. 323-331
◽
2018 ◽
Vol 138
(7)
◽
pp. 571-581
◽
Keyword(s):
2020 ◽
Vol 14
(18)
◽
pp. 3738-3749
Keyword(s):
Keyword(s):
On the Determination of Battery Energy Storage Capacity and Short-Term Power Dispatch of a Wind Farm
2011 ◽
Vol 2
(2)
◽
pp. 148-158
◽
Keyword(s):
2015 ◽
Vol 733
◽
pp. 215-218