Corporate Level Software Management

1978 ◽  
Vol SE-4 (4) ◽  
pp. 319-326 ◽  
Author(s):  
J.D. Cooper
Author(s):  
Pham Van Truong

The author analyze deeply management status of information and communication technologies (ICTs) application in teaching at the lower secondary schools in Krong Pac District, Dak Lak province today on the back: management status of building and using multimedia classrooms; management status of using teaching software; management status of desining and using active teaching and learning (ATL) lesson plans with using ICTs; management status of using ICTs in the examination and evaluation learning outcomes of pupils from that author proposed 6 application management solutions for ICTs in the lower secondary schools in Krong Pac district, Dak Lak province in the context of technological revolution 4.0 fit the circumstances of local practices.


2004 ◽  
Vol 39 (7) ◽  
pp. 78-87 ◽  
Author(s):  
Gilles Pokam ◽  
Olivier Rochecouste ◽  
André Seznec ◽  
François Bodin

Author(s):  
B. Verhaelen ◽  
F. Mayer ◽  
S. Peukert ◽  
G. Lanza

AbstractThe trend of globalization has led to a structural change in the sales and procurement markets of manufacturing companies in recent decades. In order not to be left behind by this change, companies have internationalized their production structures. Global production networks with diverse supply and service interdependencies are the result. However, the management of global production networks is highly complex. Key performance indicator (KPI) networks already exist at the corporate level and site level to support the management of complex systems. However, such KPI networks are not yet available to support the management of entire production networks. In this article, a KPI network for global production networks is presented, which links the key figures of the site level and the corporate level. By integrating both levels into a comprehensive KPI network, cause and effect relationship between the production-related KPIs and the strategic KPIs of a corporate strategy become transparent. To this end, this KPI network is integrated into a Performance Measurement and Management (PMM) methodology. This methodology consists of three phases: performance planning, performance improvement, and performance review. For testing the practical suitability, the PMM methodology is applied to the production network of an automotive supplier using a simulation model to estimate the effects of proposed improvement actions of the methodology.


1980 ◽  
Author(s):  
Donald Reifer
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document