Coordinated optimizing control strategy between power generators and power grid in Inner Mongolia

Author(s):  
Wei Hu ◽  
Shimeng Dong ◽  
Qiuyu Lu ◽  
Fei Xu ◽  
Lianjie Lv
2011 ◽  
Vol 130-134 ◽  
pp. 2527-2529
Author(s):  
Jin Tao Guo ◽  
Jiang Xin

The improvement of RB is significant for safety of both the power plant and power grid. This paper, took the 2 × 350MW unit of Inner Mongolia Huaneng Power Plant for instance, researched on three ways to improve water supply RB, like taking a proper sliding pressure curve, improving the water supply system and optimizing the boiler combustion. In the research, we succeeded to maintain main parameters of the unit within a safety range during RB operation, and avoided a unit trip accident causing by one single pump’s fault trip. Therefore, the research’s success settled a good base for the unit’s safe and stable operation.


2021 ◽  
Author(s):  
Yang Zhang ◽  
Shaojia Feng ◽  
Xiaopin Yang ◽  
Wentao Xia ◽  
Tian Gao ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document