Validation of Fabricability for ITER TF Coil Structures

Author(s):  
Yutaka Chida ◽  
Masahide Iguchi ◽  
Hideo Nakajima ◽  
Koichi Oosemochi ◽  
Kenichiro Niimi ◽  
...  

The ITER superconducting magnet system consists of 18 Troidal Field (TF) coils, 6 Central Solenoid (CS) modules, 6 Poloidal Field (PF) coils and 18 Correction coils. The Japan Atomic Energy Agency (JAEA), acting as the Japan Domestic Energy Agency (JADA) in the ITER project, is responsible for the procurement of 9 TF coil winding packs (WP), structures for 19 TF coils, (including one spare), and assembly of the WP and the coil structures for 9TF coils [1]. TF coil structures, which support large electromagnetic force generated in TF coils under the cryogenic temperature (about 4K), are the mega welding structures composed of coil case and support structures made of heavy thickness high strength and high toughness stainless steel. JAEA started the study on welding trials for the materials to be used since 2008 and have been demonstrating of full scale mock-up model fabrication for main sub-components since 2010. This paper introduces the results on welding trials and status of full scale mock-up model fabrication before fabricating actual products. Enough weld joint performance was obtained with the base metal of JJ1 (FMJJ1 specified by JSME (The Japan Society of Mechanical Engineers) Code [2] and is developed in Japan) and SS316LN (FM316LN specified by JSME Code), and also their combination using JJ1 filler wire (FMYJJ1 specified by JSME Code and is developed in Japan) by narrow gap GTAW process. Welding deformation such as angular distortion between outer plate and side plates of U-shape segment could be controlled and minimized by using effective restraint jig in trial manufacturing of 1m long leg. Validity of welding technology and manufacturing design are confirmed during full scale mock-up model fabrication. And also investigations such as UT (ultrasonic test) and effective welding process for rationalization have been performed.

Author(s):  
Kiyoshi Okuno ◽  
Hideo Nakajima ◽  
Yoshikazu Takahashi ◽  
Norikiyo Koizumi

The ITER Agreement was signed on 21 November 2006 and the ITER Organization (IO) was officially started. IO undertook a Design Review of ITER and the ITER baseline design was established as a basis for starting construction, together with the reference Integrated Project Schedule. In parallel, Japan Atomic Energy Agency (JAEA) performed extensive development work as procurement preparation including TF conductor, TF coil winding and TF coil structures. Based on the achievements from these developments, JAEA started the actual procurement from March 2008 by placing contracts on the industries in line with the Integrated Project Schedule.


2016 ◽  
Vol 26 (4) ◽  
pp. 1-5 ◽  
Author(s):  
D. Z. Xie ◽  
J. Y. Benitez ◽  
A. Hodgkinson ◽  
T. Loew ◽  
C. M. Lyneis ◽  
...  

1996 ◽  
Vol 30 (3P2B) ◽  
pp. 1253-1257
Author(s):  
Takashi Kato ◽  
Kunihiro Matsui ◽  
Susumu Shimamoto ◽  
Kazuhiko Nishida ◽  
Tadaaki Honda ◽  
...  

1992 ◽  
Vol 28 (1) ◽  
pp. 186-189 ◽  
Author(s):  
V.I. Deev ◽  
V.S. Kharitonov ◽  
V.V. Shako ◽  
A.I. Ageyev ◽  
S.R. Bakhuliev ◽  
...  

2007 ◽  
Vol 47 (5) ◽  
pp. 456-462 ◽  
Author(s):  
K Okuno ◽  
H Nakajima ◽  
M Sugimoto ◽  
T Isono ◽  
K Kawano ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document