Building a Body of Knowledge in Construction Project Delivery, Procurement and Contracting

10.1142/11952 ◽  
2022 ◽  
Author(s):  
Giovanni C Migliaccio ◽  
Pramen P Shrestha
2017 ◽  
Vol 17 (1) ◽  
pp. 90-111 ◽  
Author(s):  
Micael Thunberg ◽  
Martin Rudberg ◽  
Tina Karrbom Gustavsson

Purpose This study aims to identify and categorise common on-site problems from a supply chain management (SCM) perspective and to trace the origin of these problems in the construction project process, the supply chain or in the intersection between these processes. This allows for identification of how on-site problems affect SCM in construction projects and how they can be mitigated. Design/methodology/approach A literature review in combination with semi-structured interviews was used to identify on-site problems. This enabled triangulation and strengthened both construct validity and internal validity. Findings On-site problems can be categorised in one of the four following categories: material flows, internal communication, external communication or complexity. The first category has its origin in the supply chain, the second in the construction project process, the third in the supply chain-construction process intersection on site and the fourth in the construction project as a whole. The findings conclude that on-site problems often originate from construction companies’ lack of supply chain orientation. Research limitations/implications It is suggested that supply chain planning (SCP) can facilitate on-site problem mitigation in construction project management. This extends the body of knowledge of SCP in construction project management and supports the development of effective on-site construction project management. Practical implications The results show that SCP can aid construction project management in handling on-site problems earlier in the project process. Originality/value The main value lies in extending the body of knowledge in construction project management research by applying an SCM perspective and by introducing SCP to support more effective construction project management.


Author(s):  
Clinton Aigbavboa ◽  
Neo Malose Masemeni ◽  
Wellington Thwala

This chapter report on some of the challenges faced and successes achieved during the construction of the recently completed Department of Environmental Affairs (DEA) headquarters in South Africa. Qualitative interviews where conducts with five (5) professionals which were part of the construction supply chain team that completed the DEA project in South Africa. Findings summary were that the South African construction industry exists in a very dynamic and volatile environment with common challenges as evident in other countries. This challenge, necessitates the use of collaborative means of managing the various phases of the supply chain. It was also found that the use of collaborative models such as Public Private Partnership (PPP) can prove rewarding when stakeholders involved in a project have an understanding of the model and its dynamics. This chapter contributes to the use of PPP collaborative models in construction project delivery in South Africa.


Author(s):  
Clinton Aigbavboa ◽  
Neo Malose Masemeni ◽  
Wellington Thwala

This chapter report on some of the challenges faced and successes achieved during the construction of the recently completed Department of Environmental Affairs (DEA) headquarters in South Africa. Qualitative interviews where conducts with five (5) professionals which were part of the construction supply chain team that completed the DEA project in South Africa. Findings summary were that the South African construction industry exists in a very dynamic and volatile environment with common challenges as evident in other countries. This challenge, necessitates the use of collaborative means of managing the various phases of the supply chain. It was also found that the use of collaborative models such as Public Private Partnership (PPP) can prove rewarding when stakeholders involved in a project have an understanding of the model and its dynamics. This chapter contributes to the use of PPP collaborative models in construction project delivery in South Africa.


2016 ◽  
Vol 2016 ◽  
pp. 1-7 ◽  
Author(s):  
William Paolillo ◽  
Branka V. Olson ◽  
Edward Straub

People-centered innovation is a paradigm shift in the construction industry. It is derived from the supposition that people not methods, schedules, or budgets deliver projects. Our data suggest that a multilevel, multidisciplinary project team through shared vision, values, and a common vernacular defines, designs, and delivers more successful projects than traditional methods. These projects meet the needs of shareholders, the community, stakeholders, and the planet. We employ the concepts of emotional intelligence and agency theory to explain an integrated project delivery (IPD) construction project using lean tactics that not only delivered, but also exceeded expectations resulting in a six-month schedule acceleration and $60M savings over the original estimated cost of the project calculated assuming traditional project delivery methods. The safety rating for this project was 50% better than the national average and the expected improvement in operating margin for the new building is 33% greater. This paper introduces the notion of people-centered innovation to an industry that has struggled to adapt and show positive results over recent decades. Our case study describes the significance of people-centered innovation in construction project delivery. We discuss the implications for the construction industry going forward.


2019 ◽  
Vol 27 (1) ◽  
pp. 186-204 ◽  
Author(s):  
Serdar Durdyev ◽  
M. Reza Hosseini ◽  
Igor Martek ◽  
Syuhaida Ismail ◽  
Mehrdad Arashpour

Purpose The purpose of this paper is to quantify the barriers to the use of integrated project delivery (IPD), as assessed by 115 construction professionals in Malaysia. Design/methodology/approach Barriers recording highest citation amongst researchers worldwide were collated in the form of a conceptual model. This model was validated via a partial least squares structural equation modelling technique. Findings Findings advance the body of knowledge on IPD by providing original insights into the nature of key barriers, quantifying the relative importance of each barrier. Research limitations/implications Despite the above-mentioned contributions, and before drawing any conclusion, it is prudent to acknowledge limitations, particularly the chosen research approach in focusing on the Malaysian context. Therefore, caution must be exercised in direct application of findings to other contexts; research findings should be seen through the lens of moderatum generalisations (see Payne and Williams, 2005). Practical implications Apart from contributions to the body of knowledge, for the world of practice, conditions impacting a transition to IPD are discussed, with a recommendation for change management through a tested mechanism like the European Corporate Sustainability Framework. Originality/value Being the first empirical study undertaken to quantify the relationship among the identified barriers and IPD, the present study contributes to the field by addressing the gap in IPD research in Malaysia, as an exemplar of a developing country; it creates knowledge to inform further improvements in project performance through facilitating IPD use. The study also offers insight to construction stakeholders in other developing countries for tackling issues that hinder the adoption of an IPD approach, and it also points to major barriers such that resources for tackling barriers may be allocated properly.