Categorising on-site problems

2017 ◽  
Vol 17 (1) ◽  
pp. 90-111 ◽  
Author(s):  
Micael Thunberg ◽  
Martin Rudberg ◽  
Tina Karrbom Gustavsson

Purpose This study aims to identify and categorise common on-site problems from a supply chain management (SCM) perspective and to trace the origin of these problems in the construction project process, the supply chain or in the intersection between these processes. This allows for identification of how on-site problems affect SCM in construction projects and how they can be mitigated. Design/methodology/approach A literature review in combination with semi-structured interviews was used to identify on-site problems. This enabled triangulation and strengthened both construct validity and internal validity. Findings On-site problems can be categorised in one of the four following categories: material flows, internal communication, external communication or complexity. The first category has its origin in the supply chain, the second in the construction project process, the third in the supply chain-construction process intersection on site and the fourth in the construction project as a whole. The findings conclude that on-site problems often originate from construction companies’ lack of supply chain orientation. Research limitations/implications It is suggested that supply chain planning (SCP) can facilitate on-site problem mitigation in construction project management. This extends the body of knowledge of SCP in construction project management and supports the development of effective on-site construction project management. Practical implications The results show that SCP can aid construction project management in handling on-site problems earlier in the project process. Originality/value The main value lies in extending the body of knowledge in construction project management research by applying an SCM perspective and by introducing SCP to support more effective construction project management.

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Arash Fahmi Hassan ◽  
Farzad Haghighi-Rad ◽  
Amir-Reza Abtahi

Purpose This paper aims to design and develop a management game in the field of construction project management so that by playing the game, the required level of knowledge, skills, capabilities and overall project management competencies in individuals will be promoted. Also, player’s competencies can be measured. Design/methodology/approach This study, in terms of application, is applied research. The construction project management simulation game (CPMSG) was played by 18 university students. To evaluate the level of the players’ project management knowledge and quality of the game, questionnaires were used. Findings The game improves the players’ project management knowledge by 158%, and the educational program that was formulated in the game has also achieved the first three levels of bloom’s taxonomy of educational objectives. In the field of game quality, analysis of players’ results of responses and scores show that the game has a good quality level. Originality/value The CPMS game provides a useful tool for project management training, especially in the field of construction projects. It helps in addition to improving the quality of teaching theoretical topics, making students acquainted with the risks and uncertainties of such projects, and provides a simulated experience. In the field of common behavior analysis and player’s selection, the results indicated that the majority of groups used high-quality materials during the games to perform activities related to the appearance of the building (such as finishing and building facade activities) and used medium quality materials in implementing infrastructural activities such as brickwork and floor construction that are not visible in the appearance of work.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Roberto Pessoa de Queiroz Falcão ◽  
Michel Mott Machado ◽  
Eduardo Picanço Cruz ◽  
Caroline Shenaz Hossein

PurposeThe purpose of this article is to investigate how social integration, immigrant networks and barriers to ventureing affect the entrepreneurial activities of Brazilians in Canada, indicating how mixed embeddedness takes place in that context.Design/methodology/approachData were collected in Toronto, through the application of a survey with 74 Brazilian entrepreneur respondents and 42 semi-structured interviews with selected subjects, thus representing a multi-method approach. The analysis included descriptive statistics from the survey data and a qualitative analysis of the trajectories and life stories of Brazilian immigrants.FindingsOur sample comprises respondents with a high level of education and proficiency in English, coming predominantly from the southeast of Brazil, white, aged from 30 to 49. The majority of businesses are small and related to the service sector. The article contributes to the literature by discussing the elements related to mixed embeddedness, including the need for cultural adaptation and for the creation of networks as a crucial element for business venturing.Research limitations/implicationsThe study focuses on entrepreneurs regardless of their businesses sector or formality/informality status. It could be used as an instrument to support Canadian public policies for welcoming Brazilians and for the Brazilian government to prevent the evasion of potential entrepreneurs.Originality/valueThe article contributes to the body of knowledge of immigrant entrepreneurship in Canada and of Brazilian entrepreneurship overseas. The results suggest factors that may be relevant to the expansion of their business, such as social networking, cultural embeddedness and adaptation of the products/services to a wider range of target customers.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Saad Zighan

Purpose This study aims to answer the question of how firms can deal with the great bullwhip effects caused by COVID-19? Design/methodology/approach An exploratory research method has been adopted and evidence was collected based on 41 online interviews. Findings The study finds that the bullwhip effect is caused by the sudden changes in customers purchasing behaviour during the pandemic and the businesses’ inaccurate anticipation of the situation. Managing the bullwhip effects caused by COVID-19 requires situation awareness, localisation and an intelligent supply chain. Situation awareness is a vital concept in emergency response, knowing what is going to figure out what should be done. Furthermore, reducing the geographical distances between the firm and other parties in the supply chain, which equates to supply chain localisation, enforces just-in-time inventory. Finally, supply chain digitalisation is no longer an option; implementing such a solution enables end-to-end visibility, collaboration, flexibility and optimisation of orchestration of the supply chain. Research limitations/implications This study presents indicators explaining how organisations can deal with the great bullwhip effects caused by COVID-19. Originality/value The ongoing outbreak of the COVID-19 pandemic has brought about significant challenges for supply chain management, and this study contributes to the body of knowledge and proposes a model of reducing the bullwhip effects.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Natasja Steenkamp ◽  
Roslyn Roberts

Purpose This paper aims to explore how advanced integrated report preparers internalise and operationalise material value creation information to manage the generation of such information for the integrated report. Design/methodology/approach The paper adopts a qualitative approach using in-depth semi-structured interviews to examine how information about material value creation matters in six South African organisations are managed. Findings The findings will be useful to integrated reporting adopters as to how they might implement appropriate processes and systems to determine, communicate, collect and process information about matters that substantively affect their value creation. Originality/value The paper contributes to the body of knowledge by providing insight on how material value creation matters are determined, communicated internally and information about such matters generated.


2015 ◽  
Vol 20 (6) ◽  
pp. 613-630 ◽  
Author(s):  
Claudine Antoinette Soosay ◽  
Paul Hyland

Purpose – This paper aims to conduct a systematic review of the literature on supply chain collaboration published over a 10-year period from 2005 to 2014. It explores the nature and extent of research undertaken to identify key themes emerging in the field and gaps that need to be addressed. Design/methodology/approach – The authors review a sample of 207 articles from 69 journals, after using an iterative cycle of defining appropriate search keywords, searching the literature and conducting the analysis. Findings – Key themes include the meaning of collaboration; considerations for supply chain collaboration theory; emerging areas in collaboration for sustainability, technology-enabled supply chains and humanitarian supply chains; and the need for a more holistic approach, multi-tier perspectives and research into B2C collaborations. Research limitations/implications – The paper provides discussion and scope for future research into the area which would contribute to the field tremendously. Originality/value – There have been very few reviews in the past on supply chain collaboration, and this is one of the first extensive reviews conducted to address how well the body of knowledge on supply chain collaboration corresponds with our contemporary society.


2016 ◽  
Vol 6 (4) ◽  
pp. 401-416 ◽  
Author(s):  
Arti Saraswat

Purpose The UK government is actively promoting higher apprenticeships and degree apprenticeships and this agenda has been gaining momentum amongst the various providers of apprenticeships. The purpose of this paper is to draw on an exploratory study on English further education (FE) colleges and highlight some of the key drivers of delivery, and possible challenges that can be faced by the providers in any expansion of this provision. Staff perceptions on the new apprenticeship standards are also presented in the paper. Design/methodology/approach This paper draws on a qualitative exploratory study with ten FE colleges in England. As part of the study, 19 in-depth semi-structured interviews were conducted with college staff and managers. Findings Higher apprenticeships have the potential to offer work-focussed alternatives to the conventional full-time degree models of higher education, however, the paper sheds light on a number of factors can limit the uptake of higher and degree apprenticeships. Practical implications The paper presents some practical challenges in developing higher apprenticeships and outlines some successful instances of higher apprenticeships which will be useful for those involved in the design and delivery of apprenticeships at FE colleges as well as at other providers. Originality/value This paper draws on research with FE colleges and will be of particular significance to FE colleges and universities that may consider delivering higher apprenticeships. The paper presents insights into institutional experiences and decision-making associated with higher and degree apprenticeships and, in doing so, the paper offers valuable contributions to the body of knowledge in this under-researched area.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Wolfgang Grenzfurtner ◽  
Manfred Gronalt

Purpose This paper aims to identify those factors, which will improve the collaboration between industrialised housebuilding (IHB) companies and their subcontractors within continuous improvement (CI) programmes. These factors will enhance the supply chain (SC) efficiency and productivity, eliminating obstacles when designing, implementing and managing CI programmes within IHB SC. Design/methodology/approach An explorative case study with a mixed-method approach was conducted within an IHB SC. To collect data, participant observation and guided interviews were applied. A stakeholder analysis was conducted to structure their guiding principles. A causal loop diagram (CLD) analysis was used to model the effects on and relationships within a SC and their impact on the involvement of subcontractors. Findings The influences on the stakeholders and the guidelines under which they work are defined. Potential conflicts of interest between stakeholders are identified. A CLD is used to model a better understanding of system behaviour impacting on the relationships within the SC and on subcontractor involvement. The results provide a number of factors that need to be considered when designing, implementing and managing a CI programme. Research limitations/implications The research suggests better ways to use subcontractors’ specific knowledge of on-site processes such that productivity and efficiency are enhanced. Improvements within the construction supply chain (CSC) will, in the future, not be limited to small improvement gains at company level. Originality/value This paper extends the body of knowledge in CSC management by revealing factors important for designing, implementing and managing CI programmes, which enables the successful involvement of subcontractors in CI on SC level.


2017 ◽  
Vol 24 (1) ◽  
pp. 154-169 ◽  
Author(s):  
Sami Kärnä ◽  
Juha-Matti Junnonen

Purpose In a construction project, “participants’ satisfaction” is one of the main dimensions used for measuring the successfulness of a project. Designers perform a major role in attaining the project goals and managing project complexity during production. The purpose of this paper is to examine the designers’ performance as evaluated by the main participants: the client, the project consultant/manager and the main contractor, and to identify the main success factors of designer performance using the participants’ evaluation. The study also aims to examine how the economic size of a project affects the project participants’ assessment of the designer’s performance. It is assumed that as the size of a project increases, so does the complexity of the project, which will affect the scope of work and demands on the designers’ operational performance for the specific project level. Design/methodology/approach The Finnish project evaluation and benchmark database was used in this study as empirical data. The quantitative data consists of surveys on the project level and are based on a multi-dimensional standard evaluation wherein the main participants evaluate each other’s performances. The client, project consultant and main contractor evaluated the designer’s performance. The data of the study consisted of a total of 892 evaluations. ANOVA analysis was used to examine the differences between the project participants’ assessments based upon the different economic sizes of the projects. Findings Contractors were satisfied with the designers’ performance in small projects, whereas the client and the project consultant/manager rated the designers’ performance most successful in large projects. This result may be due to small projects are typically simple and less complex, in which case design solutions are generally well-defined. Nonetheless, the participants’ level of satisfaction follows the same factors. The main problems in the designers’ performance were related to the design content: the flawlessness and comprehensiveness, as well as the compatibility and consistency of designs. These factors were emphasized particularly in the client’s low satisfaction of the designer’s performance. However, project participants were satisfied with the collaboration with designers; however, room for improvement could be found in internal communication and collaboration within the design teams. The findings illustrated that the assessment of the success rate of a project was party-specific, which was clearly affected by the size of the project, as large projects appeared to be more complex than smaller ones. Practical implications The findings suggested that there is a need to develop project-specific practices in managing multidisciplinary design teams. Additionally, particularly in large projects, designers should focus more on solving problems and design requirements occurring at the construction site. However, this should be implemented in such a way that this does not interfere with the design activities conducted with the client and project management. While client satisfaction is low in the small projects, designers should focus more on customer-oriented methods to serve client needs better. Originality/value In construction project management studies, there is a need to measure the importance that various participants assign to different success factors. Since project success factors depend on project type, a more project-specific approach is suggested to identify the main parameters for measuring project success. This study provides a holistic approach of the designers’ performance, which contributes to the theory of project success and designers’ performance improvement.


2018 ◽  
Vol 31 (3) ◽  
pp. 358-379 ◽  
Author(s):  
Farhad Panahifar ◽  
P.J. Byrne ◽  
Mohammad Asif Salam ◽  
Cathal Heavey

Purpose The purpose of this paper is to identify and assess the interrelationships between various characteristics of information sharing and trust and their criticality for effective information-centred supply chain collaboration initiatives and, in turn, its criticality to overall firm’s performance. Design/methodology/approach A survey of 189 executives from different firms was conducted and the resulting data were analysed to investigate how collaboration enablers affect effective collaboration and to determine its impacts on organisational performance. Structural equation modelling through partial least squares is used to study the relationships between four enablers (trust, information readiness, information accuracy and information security), perceived collaboration success, and two outcomes (sales growth and overall operational performance). Findings The empirical results indicate that three collaboration enablers including trust, information readiness and secure sharing of information improve supply chain collaboration. The present study finds that “secure sharing of information” was the most important factor in fostering information sharing-centred collaboration. The present study also demonstrates that effective collaboration positively and significantly influences on firm’s performance. Practical implications This study provides researchers and practitioners with a more comprehensive understanding about the information sharing-centred collaboration, its enablers and effects on firms’ performance in a supply chain context. Future research should focus on developing additional constructs that may capture other drivers of effective collaboration. Originality/value The present study makes an empirical contribution to the body of knowledge by investigating an integrated framework focussing on the enablers of collaboration through information sharing and its impact on firms’ performance.


Sign in / Sign up

Export Citation Format

Share Document