This paper argues that in order for strategic environmental assessment (SEA) to be effectively applied in transport policy, plan and programme making, the existence of certain context elements is essential. However, currently, these are only partly in place. Elements revolve around formal requirements and clear provisions for SEA, the existence of transparent and consistent value frames, the consideration of traditional decision making approaches, systematic tiering, a willingness to cooperate, an acknowledgement of uncertainties and appropriate funding, time as well as support. Focusing on transport case studies from the Netherlands, Finland, Germany and the U.K., the paper provides some empirical evidence for the importance of these context elements.

2018 ◽  
Vol 10 (7) ◽  
pp. 2463 ◽  
Author(s):  
Maartje Bodde ◽  
Karin van der Wel ◽  
Peter Driessen ◽  
Arjan Wardekker ◽  
Hens Runhaar

Strategic environmental assessment (SEA) is a widely applied policy tool that aims to aid decision-makers in making informed, higher-quality decisions that minimize negative environmental impacts. However, different types of uncertainties complicate the ex ante assessment of environmental impacts. Literature suggests uncertainties are often not well addressed, resulting in inaccurate and even unreliable SEAs. At the same time, SEA literature offers limited guidance in how to systematically identify and deal with uncertainties. Therefore, in this paper, we present an analytical framework for characterizing and classifying different forms of uncertainty in SEA, and for identifying strategies for dealing with these uncertainties. The framework is based on literature on uncertainties in other subdomains of the environmental sciences. The framework is applied to five case studies of SEAs for spatial planning in The Netherlands in order to illustrate and critically reflect on our framework, and to bridge the gap between theory and practice. Based on these case studies we concluded the following: (1) The framework is useful for identifying uncertainties in SEA in a systematic way; (2) There is a discrepancy between how uncertainties are dealt with in theory and in practice; (3) In practice, uncertainties seem to be dealt with in a rather implicit way. The framework may help dealing with uncertainties more systematically and more proactively; (4) The most successful way of coping with uncertainties seems to be the application of multiple strategies.


2005 ◽  
Vol 07 (02) ◽  
pp. 267-286 ◽  
Author(s):  
AREND KOLHOFF ◽  
ROEL SLOOTWEG

This paper provides an overview of the way biodiversity issues are dealt with in strategic environmental assessment (SEA) for spatial plans in the Netherlands. Spatial plans are selected as subject of study because 50 percent of all SEA studies executed in the Netherlands are carried out for spatial plans. Secondly, these plans provide an overarching framework for multiple interventions with potential impacts on biodiversity. It is, therefore, important to pay particular attention to biodiversity at the strategic level of a spatial plan. The evaluation is based on five spatial plans that have been subject to SEA, two national plans, two provincial plans and one local plan. Based on these assessments a number of conclusions are presented on the assessment of biodiversity in SEA for spatial plans in the Netherlands. The evaluation of case studies on which this paper is based was undertaken to produce a submission to the Convention on Biological Diversity for the drafting of international guidelines on biodiversity in SEA.


2012 ◽  
Vol 178-181 ◽  
pp. 820-824
Author(s):  
Li Li Tian ◽  
Ya Fei Zhao

Some strategic environmental assessment (SEA) pilot cases in China strive to integrate environmental issues into the planning from the beginning. One of them is the SEA for development strategy of Tianjin Binhai New Area. The SEA adopted an interactive assessment mode with the decision-making process and predicted the environmental impacts of the development strategy on land resource, water resource, energy, surface water, atmospheric environment, and ecosystem of land area and offshore area. The future development strategy of circular economy and low-carbon economy in Tianjin Binhai New Area was also analyzed. Finally, experience from the SEA case was discussed. The case study shows that support from non-environmental agencies, early integration of SEA process and planning process, interactive assessment mode, and sensible environmental protection strategy facilitate the integration of environment into decision-making.


2020 ◽  
Vol 7 (2) ◽  
pp. 95-100
Author(s):  
Marina Stenek ◽  
Bojana Nardi ◽  
Nenad Mikulić

Development and evaluation of alternatives is a key process in the strategic environmental assessment (SEA), which enables improvement of the environment, informed decision-making, greater transparency and better opportunities for public participation. It is also the most challenging part of the assessment, because the alternatives are often avoided or considered to the extent to meet the legal requirements. The absence of alternatives in the assessment process significantly diminishes the contribution of SEA to the environmental protection system. The paper will outline the generally applicable methodology for the development and assessment of alternatives in the SEA process, on the example of the Development Strategy of the City of Solin, which is based on the development of the environmental alternative, which significantly contributes to the development of sustainable strategic solutions.


2009 ◽  
Vol 11 (01) ◽  
pp. 1-28 ◽  
Author(s):  
TARJA SÖDERMAN ◽  
TUOMAS KALLIO

Experiences from the Finnish Strategic Environmental Assessment (SEA) Act were studied by surveying 35 SEA processes. Integration of plan or programme preparation and assessment, organisation of assessment, public participation and consultation, treatment of alternatives, scoping, impact assessment methods, effectiveness, environmental reporting, follow-up, effects on plan or programme preparation, assessment costs and consistency of the assessment were examined and evaluated. The results suggest that SEA is not yet used properly in decision-making. Several shortcomings characterised assessment practices in public participation, establishment and comparison of alternatives, definition of environmental problems, recognition of significant impacts and readiness to use SEA as a planning tool to integrate environmental considerations into the planning. In consequence, the assessments had only minor effects on the adopted plans and programmes. The most critical challenges in Finnish SEA practise are focusing on the most significant environmental issues and strengthening the links between planning, participation and decision-making.