scholarly journals The use of application scanners in software product quality assessment

Author(s):  
Stefan Wagner
2017 ◽  
Vol 86 ◽  
pp. 350-366 ◽  
Author(s):  
Miltiadis G. Siavvas ◽  
Kyriakos C. Chatzidimitriou ◽  
Andreas L. Symeonidis

Author(s):  
Andriy Lishchytovych ◽  
Volodymyr Pavlenko

The present article describes setup, configuration and usage of the key performance indicators (KPIs) of members of project teams involved into the software development life cycle. Key performance indicators are described for the full software development life cycle and imply the deep integration with both task tracking systems and project code management systems, as well as a software product quality testing system. To illustrate, we used the extremely popular products - Atlassian Jira (tracking development tasks and bugs tracking system) and git (code management system). The calculation of key performance indicators is given for a team of three developers, two testing engineers responsible for product quality, one designer, one system administrator, one product manager (responsible for setting business requirements) and one project manager. For the key members of the team, it is suggested to use one integral key performance indicator per the role / team member, which reflects the quality of the fulfillment of the corresponding role of the tasks. The model of performance indicators is inverse positive - the initial value of each of the indicators is zero and increases in the case of certain deviations from the standard performance of official duties inherent in a particular role. The calculation of the proposed key performance indicators can be fully automated (in particular, using Atlassian Jira and Atlassian Bitbucket (git) or any other systems, like Redmine, GitLab or TestLink), which eliminates the human factor and, after the automation, does not require any additional effort to calculate. Using such a tool as the key performance indicators allows project managers to completely eliminate bias, reduce the emotional component and provide objective data for the project manager. The described key performance indicators can be used to reduce the time required to resolve conflicts in the team, increase productivity and improve the quality of the software product.


Sign in / Sign up

Export Citation Format

Share Document