Simulation Based Job Scheduling Optimization for Batch Workloads

Author(s):  
Dheeraj Chahal ◽  
Benny Mathew ◽  
Manoj Nambiar
2012 ◽  
Vol 2012 ◽  
pp. 1-16 ◽  
Author(s):  
Seungchul Lee ◽  
Jun Ni

This paper presents wafer sequencing problems considering perceived chamber conditions and maintenance activities in a single cluster tool through the simulation-based optimization method. We develop optimization methods which would lead to the best wafer release policy in the chamber tool to maximize the overall yield of the wafers in semiconductor manufacturing system. Since chamber degradation will jeopardize wafer yields, chamber maintenance is taken into account for the wafer sequence decision-making process. Furthermore, genetic algorithm is modified for solving the scheduling problems in this paper. As results, it has been shown that job scheduling has to be managed based on the chamber degradation condition and maintenance activities to maximize overall wafer yield.


2017 ◽  
Vol 12 (4) ◽  
pp. 373-397 ◽  
Author(s):  
Salim Bitam ◽  
Sherali Zeadally ◽  
Abdelhamid Mellouk

2019 ◽  
Vol 25 (1) ◽  
pp. 65-89 ◽  
Author(s):  
Abdul Hameed ◽  
Syed Asif Raza ◽  
Qadeer Ahmed ◽  
Faisal Khan ◽  
Salim Ahmed

Purpose The purpose of this paper is to develop a decision support tool for risk-based maintenance scheduling for a large heavily equipped gas sweetening unit in a Liquefied Natural Gas (LNG) plant. Two conflicting objectives, i.e., total maintenance cost and the reliability, are considered in the tool. The tool is tested with the real plant data and suggests several Pareto-optimal schedules for a decision maker to choose from. The financial impacts are assessed. Design/methodology/approach A bi-objective scheduling optimization model is developed for maintenance scheduling using a risk-based framework. The model is developed integrating genetic algorithm and simulation-based optimization to find Pareto-optimal schedules. The model delivered true Pareto front optimal solutions for given plant-specific data. The two conflicting objectives: the minimization of total expenditures incurred on maintenance-related activities and improving the total reliability are considered. Findings For large and complex processing facilities such as LNG plant, a shutdown of facility generates a significant financial impact, resulting in millions of dollars in production loss. The developed risk-based equipment selection strategy helps to minimize such an event of production loss by generating a thorough maintenance strategy for inspection, repair, overhaul or replacement schedule of the unit without initiating the shutdown. The proposed model has been successfully applied to obtain an optimize maintenance schedule for a gas sweetening unit. Research limitations/implications A future work may consider the state-dependent models for various failure modes that will result in obtaining a better representation of the model. The proposed scheduling can further be extended to multi-criteria scheduling including availability, resource limitation and inflationary condition. A comparative analysis with other meta-heuristic techniques such as harmony search algorithm, tabu search, and simulated annealing will further help in confirming the schedule obtained from this application. Practical implications Maintenance scheduling using a conventional approach for special equipment generally does not consider the conflicting objectives. This research addresses this aspect using a bi-objective model. The usefulness of risk-based method is to assist in minimizing the financial and safety risk exposure to the operating companies, but some variation in results is expected due to varying risk matrix for different organizations. Social implications Managing two objectives, i.e., minimizing the cost of maintenance-related activities, while at the same time maximizing the overall reliability dramatically, helps in mitigating adverse safety and financial risk due to fires, explosions, fatality and excessive maintenance cost. Originality/value Research develops a decision support tool for managing conflicting objectives for an LNG process. This research highlights the impact of utilizing the simulation-based approach coupled with risk-based equipment selection for complex processing unit or plant maintenance scheduling optimization.


Sign in / Sign up

Export Citation Format

Share Document