scholarly journals Two-Agent Single Machine Order Acceptance Scheduling Problem to Maximize Net Revenue

Complexity ◽  
2021 ◽  
Vol 2021 ◽  
pp. 1-14
Author(s):  
Jiaji Li ◽  
Yuvraj Gajpal ◽  
Amit Kumar Bhardwaj ◽  
Huangen Chen ◽  
Yuanyuan Liu

The paper considers two-agent order acceptance scheduling problems with different scheduling criteria. Two agents have a set of jobs to be processed by a single machine. The processing time and due date of each job are known in advance. In the order accepting scheduling problem, jobs are allowed to be rejected. The objective of the problem is to maximize the net revenue while keeping the weighted number of tardy jobs for the second agent within a predetermined value. A mixed-integer linear programming (MILP) formulation is provided to obtain the optimal solution. The problem is considered as an NP-hard problem. Therefore, MILP can be used to solve small problem instances optimally. To solve the problem instances with realistic size, heuristic and metaheuristic algorithms have been proposed. A heuristic method is used to determine and secure a quick solution while the metaheuristic based on particle swarm optimization (PSO) is designed to obtain the near-optimal solution. A numerical experiment is piloted and conducted on the benchmark instances that could be obtained from the literature. The performances of the proposed algorithms are tested through numerical experiments. The proposed PSO can obtain the solution within 0.1% of the optimal solution for problem instances up to 60 jobs. The performance of the proposed PSO is found to be significantly better than the performance of the heuristic.

2014 ◽  
Vol 2014 ◽  
pp. 1-13 ◽  
Author(s):  
Ehsan Molaee ◽  
Ghasem Moslehi

Most scheduling problems are based on the assumption that machines work continuously during the planning horizon. This assumption is not true in many production environments because the machine may not be available during one or more periods such as during breakdowns or maintenance operations. In this paper, the problem of the single machine scheduling with one unavailability period and nonresumable jobs with the aim of minimizing the number of tardy jobs is studied. A number of theorems are proved and a heuristic procedure is developed to solve the problem. A branch-and-bound approach is also presented which includes upper and lower bounds and efficient dominance rules. Computational results for 2680 problem instances show that the branch-and-bound approach is capable of solving 98.7% of the instances optimally, bearing witness to the efficiency of the proposed procedure. Our results also indicate that the proposed approaches are more efficient when compared to other methods.


Author(s):  
Ali Skaf ◽  
Sid Lamrous ◽  
Zakaria Hammoudan ◽  
Marie-Ange Manier

The quay crane scheduling problem (QCSP) is a global problem and all ports around the world seek to solve it, to get an acceptable time of unloading containers from the vessels or loading containers to the vessels and therefore reducing the docking time in the terminal. This paper proposes three solutions for the QCSP in port of Tripoli-Lebanon, two exact methods which are the mixed integer linear programming and the dynamic programming algorithm, to obtain the optimal solution and one heuristic method which is the genetic algorithm, to obtain near optimal solution within an acceptable CPU time. The main objective of these methods is to minimize the unloading or the loading time of the containers and therefore reduce the waiting time of the vessels in the terminals. We tested and validated our methods for small and large random instances. Finally, we compared the results obtained with these methods for some real instances in the port of Tripoli-Lebanon.


Impact ◽  
2020 ◽  
Vol 2020 (8) ◽  
pp. 60-61
Author(s):  
Wei Weng

For a production system, 'scheduling' aims to find out which machine/worker processes which job at what time to produce the best result for user-set objectives, such as minimising the total cost. Finding the optimal solution to a large scheduling problem, however, is extremely time consuming due to the high complexity. To reduce this time to one instance, Dr Wei Weng, from the Institute of Liberal Arts and Science, Kanazawa University in Japan, is leading research projects on developing online scheduling and control systems that provide near-optimal solutions in real time, even for large production systems. In her system, a large scheduling problem will be solved as distributed small problems and information of jobs and machines is collected online to provide results instantly. This will bring two big changes: 1. Large scheduling problems, for which it tends to take days to reach the optimal solution, will be solved instantly by reaching near-optimal solutions; 2. Rescheduling, which is still difficult to be made in real time by optimization algorithms, will be completed instantly in case some urgent jobs arrive or some scheduled jobs need to be changed or cancelled during production. The projects have great potential in raising efficiency of scheduling and production control in future smart industry and enabling achieving lower costs, higher productivity and better customer service.


2014 ◽  
Vol 624 ◽  
pp. 675-680
Author(s):  
Yu Fang Zhao

We studied single machine scheduling problems in which the jobs need to be delivered to customers after processing. It is assumed that the delivery times are proportional to the length of the already processed jobs, and a job's processing time depended on its position in a sequence. The objective functions include total earliness, the weighted number of tardy jobs and the cost of due date assignment. We analyzed these problems with two different due date assignment methods and conclude that the problems are polynomial time solvable.


2020 ◽  
Vol 12 (4) ◽  
pp. 63-75
Author(s):  
Zhifeng Zhang ◽  
Yusheng Sun ◽  
Yadong Cui ◽  
Haodong Zhu

Production scheduling problems have historically emphasized cycle time without involving the environmental factors. In the study, a low-carbon scheduling problem in a flexible job shop is considered to minimize the energy consumption, which mainly consists of two parts: the useful part and the wasted part. First, a mathematical model is built based on the features of the workshop. Second, a modified migrating bird's optimization (MMBO) is developed to obtain the optimal solution. In the MMBO, a population initialization scheme is designed to enhance the solution quality and convergence speed. Five types of neighborhood structures are introduced to create neighborhood solutions. Furthermore, a local search method and a reset mechanism are developed to improve the computational results. Finally, experimental results validate that the MMBO is effective and feasible.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Oğuzhan Ahmet Arık

PurposeThis paper presents a mixed-integer programming model for a single machine earliness/tardiness scheduling problem where the objective is to minimize total earliness/tardiness duration when the uncertainty of parameters such as processing times and due date is coded with grey numbers.Design/methodology/approachGrey theory and grey numbers are used for illustrating the uncertainty of parameters in processing times and common due date, where the objective is to minimize the total earliness/tardiness duration. The paper proposes a 0–1 mathematical model for the problem and an effective heuristic method for the problem by using expected processing times for ordering jobs.FindingsThe uncertainty of the processing times and common due date are encoded with grey numbers and a position-dependent mixed-integer mathematical programming model is proposed for the problem in order to minimize total grey earliness/tardiness duration of jobs having grey processing times and a common due date. By using expected processing times for ranking grey processing times, V-shaped property of the problem and an efficient heuristic method for the problem are proposed. Solutions obtained from the heuristic method show that the heuristic is effective. The experimental study also reveals that while differences between upper and lower bounds of grey processing times decrease, the proposed heuristic's performance decreases.Originality/valueThe grey theory and grey numbers have been rarely used as machine scheduling problems. Therefore, this study provides an important contribution to the literature.