US Bureau of Mines rock bolting research

Rock Bolting ◽  
2021 ◽  
pp. 313-320
Author(s):  
D.D. Bolstad ◽  
J.R.M. Hill ◽  
J.M. Karhnak
Keyword(s):  
2015 ◽  
Vol 777 ◽  
pp. 8-12 ◽  
Author(s):  
Lin Zhen Cai ◽  
Cheng Liang Zhang

HuJiaDi tunnel construction of Dai Gong highway is troublesome, the surrounding-rock mass give priority to full to strong weathering basalt, surrounding rock integrity is poor, weak self-stability of surrounding rock, and tunnel is prone to collapse. In order to reduce disturbance, taking advantage of the ability of rock mass, excavation adopt the method of "more steps, short footage and strong support". The excavation method using three steps excavation, The excavation footage is about 1.2 ~ 1.5 m; The surrounding rock bolting system still produce a large deformation after completion of the first support construction, it shows that the adopted support intensity cannot guarantee the stability of the tunnel engineering. Using ABAQUS to simulate tunnel excavation support, optimizing the support parameters of the tunnel, conducting comparative analysis with Monitoring and Measuring and numerical simulation results, it shows that the displacement - time curves have a certain consistency in numerical simulation of ABAQUS and Monitoring and Measuring.


Rock Bolting ◽  
2021 ◽  
pp. 233-239
Author(s):  
D.D. Sapegin ◽  
I.V. Pridorogina ◽  
I.V. Kozyreva

Rock Bolting ◽  
2021 ◽  
pp. 465-469
Author(s):  
M. Johansson
Keyword(s):  

Rock Bolting ◽  
2021 ◽  
pp. 243-255
Author(s):  
Sten G.A. Bergman ◽  
Sten Bjurström

Rock Bolting ◽  
2021 ◽  
pp. 397-401
Author(s):  
Paul Michelis
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document