scholarly journals Associated Control Research for Software Project Schedule and Budget Based on Function Point Method

Author(s):  
Guo-ping Jiang ◽  
Li Xie
2018 ◽  
Vol 7 (3) ◽  
pp. 1812
Author(s):  
Archana Srivastava ◽  
Dr. K. Singh ◽  
Dr Syed Qamar Abbas

Use Case Point Method (UCP) is used to estimate software development effort. UCP uses a project’s use cases to produce a reasonable estimate of a project’s complexity and required man hours. Advance Use Case Point Method (AUCP) is an extension of UCP. AUCP extends UCP by adding the additional effort required in incorporating end user development (EUD) features in the software for overall project effort estimation. Today user needs are diverse, complex, and frequently changing hence need of EUD is also increasing. EUD features if incorporated in the software increases end user satisfaction exponentially but incorporating EUD features increases design time complexity and increases the effort significantly based on the end users requirements. This paper provides a case study to demonstrate the comparative analysis of UCP and AUCP using paired t-test. It also observes that there can be on an average 20% increase in overall effort of development on adding EUD features.  


2020 ◽  
Vol 7 (1) ◽  
pp. 73
Author(s):  
Fatimah Chibbatullah ◽  
Renny Sari Dewi

In working on a software project the success of the project must begin with the right planning, if planning is wrong it will cause failure and cost overruns will occur. Therefore it is necessary to estimate the right cost to minimize the risk of over-estimates in software projects. Cost estimation in this study uses the Function Point (FP) method which is a method that measures software by measuring the functional perspective of the software to be built. There are 5 components to calculate the FP matrix, namely External Input (EI), External Output (EO), External Inquiry (EI), Internal Logical File (ILF), External File (EIF). From the research that has been done, the estimated cost of developing INLIS LITE 3.0 software, it is concluded that if Perpustakaan Nasional  want to develop INLIS LITE 3.0  software, it will require approximately IDR798.906.152 or equivalent to effort 18255,91 man / hour.


Author(s):  
Jihun Park ◽  
Dongwon Seo ◽  
Gwangui Hong ◽  
Donghwan Shin ◽  
Jimin Hwa ◽  
...  

Software planning is very important for the success of a software project. Even if the same developers work on the same project, the time span of the project and the quality of software may change based on the project plan. When software managers plan a software project, they strive to allocate human resources in a more efficient way to produce a better software with less cost. The planning process is, however, time-consuming and complicated, especially when the size of the software project is large. Many approaches have been proposed to help software project managers by providing optimal human resource allocations in terms of minimizing the cost. Previous approaches, however, only concentrated on minimizing the cost, and no existing works have considered the practical issues affecting project schedules in practice. We elicited the practical considerations relating to the human resource allocation problem through discussions with a group of software project experts. The practical considerations can affect the project schedule in practice, but their importance has not been taken into consideration in previous approaches. Reflecting the practical considerations, we propose an approach for solving the human resource allocation problem using a genetic algorithm (GA). We compare our approach to an approach that only considers minimization of the time span. Our evaluation shows that the proposed algorithm considers the practical considerations well, in terms of continuous allocation on relevant tasks, minimization of developer multitasking time, and balance of allocation. We also conducted a survey targeting software developers and managers, and the responses showed that practical considerations are as important as minimizing the cost, and our approach would be helpful to software managers. We also investigate the effect of weight factors and coefficient between sub-scores, and find that it is difficult to consider some practical considerations at the same time.


Sign in / Sign up

Export Citation Format

Share Document