Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution

2013 ◽  
Vol 7 (2) ◽  
pp. 639-643
Author(s):  
Yixiong Feng ◽  
Xiaohua Lin ◽  
Jianrong Tan
1997 ◽  
Vol 14 (4) ◽  
pp. 291-311 ◽  
Author(s):  
D. K. H. CHUA ◽  
W. T. CHAN ◽  
K. GOVINDAN

2011 ◽  
Vol 38 (2) ◽  
pp. 166-174 ◽  
Author(s):  
Hongxian Li ◽  
Mohamed Al-Hussein ◽  
Zhen Lei

The build–operate–transfer (BOT) scheme is widely applied to finance new infrastructure projects with private sector (concessionaire) participation. For a predetermined concession period (CP), assuming that CP consists of the construction duration (CD) and the concession operation period (OP), different construction durations result in different profits for the concessionaire. Meanwhile, according to the time–cost trade-off (TCT) principle, shortening the CD increases the construction cost; shortening the CD also prolongs the OP, which could increase the total benefit of BOT projects. Hence, how to arrange construction reasonably to maximize the whole profit is a key issue for a concessionary. This paper proposes a methodological framework including optimization, sensitivity analysis, and improved (incentive) genetic algorithms (GA) for BOT projects. Through the proposed methodological framework, the reasonable construction duration of a BOT project can be obtained. A numerical example is used to verify the proposed methodology.


Engineering ◽  
2009 ◽  
Vol 01 (01) ◽  
pp. 33-40 ◽  
Author(s):  
Hadi Mokhtari ◽  
Abdollah Aghaie

Sign in / Sign up

Export Citation Format

Share Document