scholarly journals Application of Interval Arithmetic to Production Planning in a Foundry

2017 ◽  
Vol 17 (1) ◽  
pp. 41-44
Author(s):  
J. Duda ◽  
A. Stawowy

Abstract A novel approach for treating the uncertainty about the real levels of finished products during production planning and scheduling process is presented in the paper. Interval arithmetic is used to describe uncertainty concerning the production that was planned to cover potential defective products, but meets customer’s quality requirement and can be delivered as fully valuable products. Interval lot sizing and scheduling model to solve this problem is proposed, then a dedicated version of genetic algorithm that is able to deal with interval arithmetic is used to solve the test problems taken from a real-world example described in the literature. The achieved results are compared with a standard approach in which no uncertainty about real production of valuable castings is considered. It has been shown that interval arithmetic can be a valuable method for modeling uncertainty, and proposed approach can provide more accurate information to the planners allowing them to take more tailored decisions.

2010 ◽  
Vol 44-47 ◽  
pp. 552-556
Author(s):  
Zhi Cong Zhang ◽  
Kai Shun Hu ◽  
Hui Yu Huang ◽  
Shuai Li

Traditional methods conduct production planning and scheduling separately and solve transfer lot sizing problem between these two steps. Unfortunately, this may result in infeasibility in planning and scheduling. We take into account transfer lot size in production planning to obtain the consistency and to eliminate the gap between planning and real production. We present the detailed Transfer Lot-Based Model with mixed integer programming. Experiments show that performance measures of a production plan change remarkably with increasing of transfer lot size.


Sign in / Sign up

Export Citation Format

Share Document