Application of BARON Solver for Solution of Cost Based Unit Commitment Problem
This paper presents the solution to cost-based unit commitment (CBUC) problem with and without ramp rate limits of thermal power plants using general algebraic modelling system (GAMS) with BARON solver. The BARON solver in GAMS environment takes care of different units and system constraints to find an optimal solution. To validate the effectiveness of the proposed GAMS solution, simulations have been performed on six different systems consisting of 10-units, 20-units, 40-units, 60-units, 80-units and 100-units, respectively. The analysis also includes the valve-point loading along with the ramp rate limits of thermal units. Results obtained with BARON solver in GAMS have been compared with other approaches available in literature. Comparative analysis shows that the performance of GAMS is better as compared to other existing techniques in terms of operating cost obtained and satisfaction level of constraints.