Micro-Economic Analysis on the Optimal Maintenance, and the Optimal Choice between Remodeling and Redevelopment of an Old House

2007 ◽  
Vol 55 (4) ◽  
pp. 217-238 ◽  
Author(s):  
Young-Man Lee ◽  
배순석
2016 ◽  
Vol 2016 ◽  
pp. 1-10 ◽  
Author(s):  
Sung-Min Choi ◽  
Yeon-Sil Lee

Currently, repair and maintenance cycles that follow the completion of construction facilities lead to the necessitation of subsequent data on the analysis of study and plan for maintenance. As such, an index of evaluation was drafted and a plan of maintenance cycle was computed using the investigation data derived from surveying target housing units in permanent rental environmental conditions, with a minimum age of 20 years, and their maintenance history. Optimal maintenance and replacement methods were proposed based on this data. Economic analysis was conducted through the Risk-Weighted Life Cycle Cost (RWLCC) method in order to determine the cost analysis of maintenance life cycle methods used for repair. Current maintenance cycle methods that have been used for 20 years were also compared with alternative maintenance cycles.


2004 ◽  
Vol 171 (4S) ◽  
pp. 303-304 ◽  
Author(s):  
Marco Dellabella ◽  
Giulio Milanese ◽  
Giovanni Muzzonigro

1981 ◽  
Vol 26 (3) ◽  
pp. 199-200
Author(s):  
Frederick Mulhauser
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document