Study on Earth Pressure of Deep-Buried Tunnel in Layered Ground with Centrifuge Modeling

Author(s):  
Xianfeng Ma ◽  
Mingyang Cao ◽  
Lei Wang ◽  
Yu Cong
Author(s):  
Kenichi SUZUKI ◽  
Hirofumi IKEMOTO ◽  
Taisuke SANAGAWA ◽  
Keita ABE ◽  
Hideaki TAKASAKI ◽  
...  

2013 ◽  
Vol 353-356 ◽  
pp. 2073-2078
Author(s):  
Tian Zhong Ma ◽  
Yan Peng Zhu ◽  
Chun Jing Lai ◽  
De Ju Meng

Slope anchorage structure of soil nail is a kind of economic and effective flexible slope supporting structure. This structure at present is widely used in China. The supporting structure belong to permanent slope anchorage structure, so the design must consider earthquake action. Its methods of dynamical analysis and seismic design can not be found for the time being. The seismic design theory and method of traditional rigidity retaining wall have not competent for this new type of flexible supporting structure analysis and design. Because the acceleration along the slope height has amplification effect under horizontal earthquake action, errors should be induced in calculating earthquake earth pressure using the constant acceleration along the slope height. Considering the linear change of the acceleration along the slope height and unstable soil with the fortification intensity the influence of the peak acceleration, the earthquake earth pressure calculation formula is deduced. The soil nailing slope anchorage structure seismic dynamic calculation model is established and the analytical solutions are obtained. The seismic design and calculation method are given. Finally this method is applied to a case record for illustration of its capability. The results show that soil nailing slope anchorage structure has good aseismic performance, the calculation method of soil nailing slope anchorage structure seismic design is simple, practical, effective. The calculation model provides theory basis for the soil nailing slope anchorage structure of seismic design. Key words: soil nailing; slope; earthquake action; seismic design;


Author(s):  
Zhu Wen ◽  
Xuening Rong ◽  
Zhen Wang ◽  
Songtong Han ◽  
Ziming Xiong ◽  
...  

Author(s):  
Xuanyu Liu ◽  
Wentao Wang ◽  
Yudong Wang ◽  
Cheng Shao ◽  
Qiumei Cong

During shield machine tunneling, the earth pressure in the sealed cabin must be kept balanced to ensure construction safety. As there is a strong nonlinear coupling relationship among the tunneling parameters, it is difficult to control the balance between the amount of soil entered and the amount discharged in the sealed cabin. So, the control effect of excavation face stability is poor. For this purpose, a coordinated optimization control method of shield machine based on dynamic fuzzy neural network (D-FNN) direct inverse control is proposed. The cutter head torque, advance speed, thrust, screw conveyor speed and earth pressure difference in the sealed cabin are selected as inputs, and the D-FNN control model of the control parameters is established, whose output are screw conveyor speed and advance speed at the next moment. The error reduction rate method is introduced to trim and identify the network structure to optimize the control model. On this basis, an optimal control system for earth pressure balance (EPB) of shield machine is established based on the direct inverse control method. The simulation results show that the method can optimize the control parameters coordinately according to the changes of the construction environment, effectively reduce the earth pressure fluctuations during shield tunneling, and can better control the stability of the excavation surface.


Sign in / Sign up

Export Citation Format

Share Document