Unlocking Operational Efficiencies for Milling Plugs in Large Monobore Completions Using Coiled Tubing with Real-Time Downhole Measurements - A Case Study from Offshore Middle East

2020 ◽  
Author(s):  
Santiago Hässig Fonseca ◽  
Nestor Molero ◽  
Pierre Ramondenc ◽  
William Tapia
2017 ◽  
Author(s):  
Andrey Nestyagin ◽  
Saif Al Arfi ◽  
Hassan Mostafa ◽  
Mohamed Elkholy ◽  
Mohamed Fekry ◽  
...  
Keyword(s):  

2021 ◽  
Author(s):  
Stefan Dinger ◽  
Andrei Casali ◽  
Frank Lind ◽  
Azwan Hadi Keong ◽  
Johnny Bårdsen ◽  
...  

Abstract Coiled tubing (CT) operations in the Norwegian continental shelf (NCS) often require a long and large-outside-diameter pipe due to big diameter completions, deep wells, and the need for high annular velocity during fluid circulation. However, getting the CT string onboard becomes a challenge when the crane lifting limit is 35 t, and using a standalone crane barge increases the cost of the operation. The alternative is spooling the CT from a vessel to the platform. Boat spooling is done by placing the CT string on a floating vessel with dynamic positioning while the standard CT injector head is secured at the edge of the platform to pull the pipe from the vessel to an empty CT reel on the platform. The boat is equipped with a CT guide; special tension clamps; and an emergency disconnect system, which consists of a standard CT shear-seal blowout preventer. The technique requires careful study of the platform structure for placement of the injector head support frame, metocean data of the field, and equipment placement on the vessel and platform. The boat spooling operation of a 7,700-m long, 58.7-t, 2.375-in.-outside-diameter CT string was successfully executed for a platform at 70-m height from mean sea level. The total operating time from hooking up the vessel to successfully spooling the string only took 12 hours. Historically for the region, the method has been attempted in sea state of up to 4-m wave height and 16 knots maximum wind speed. For this operation, the spooling was carried out during an average sea state of 2-m wave height and 15-knot wind speed. The continuous CT string allows a telemetry cable to be installed inside the pipe after the CT is spooled onto the platform reel, enabling real-time downhole measurements during the intervention. Such installation is not possible or presents high risk if the CT string is taken onboard by splicing two sections of pipe together with a spoolable connector or butt welding. From a cost perspective, the boat-spooling operation had up to 80% direct cost saving for the operator when compared to other methods of lifting a single CT string onboard, such as using a motion-compensated barge crane. The planning for the boat spooling included several essential contingency plans. Performing a CT boat spooling operation in a complex environment is possible and opens new opportunities to use longer and heavier CT strings, with lower mobilization costs. Such strings enable more advanced and efficient interventions, with the option of using real-time CT downhole measurements during the execution of a wide range of production startup work. This, in turn, is critical to support the drilling of more extended reach wells, which allow access to untapped reservoirs.


1996 ◽  
Author(s):  
Thomas Sherwin ◽  
Bruce Conrad ◽  
Robert W. Taylor

2012 ◽  
Author(s):  
Ernesto Franco ◽  
Nestor Jesus Molero ◽  
Miguel Gerardo Romandia ◽  
Cesar Nevarez Carmona ◽  
Arturo Martinez-Ballesteros ◽  
...  

2021 ◽  
Author(s):  
Ibnu Maulana ◽  
Bambang Purwanto ◽  
Doni Arief Makriva ◽  
Genie Ageng Sugiarto ◽  
Diah Setianti Kuswardani ◽  
...  

Abstract Coiled tubing (CT) equipped with fiber optics and real-time downhole telemetry and a fit-for-purpose CT tower were used in underbalanced perforating operations in six wells in Indonesia; each operation involved 800 ft of perforating guns, and each was completed in a single trip. The reservoir is thick, with high permeability and characterized by high content of CO2 and H2S. The underbalanced perforating technique was deemed fundamental to minimize formation damage in the near-wellbore area, and the campaign was part of a national strategic project to develop a block's main reserve to supply gas to drive the national economy. Each well had to be completed with minimum of an 800-ft perforation interval to deliver an average of 60 MMscf/D gas production for 16 years plateau with up to 34% CO2 content and 10,000-ppm H2S. The traditional method of e-line overbalanced perforating in such harsh environment became inefficient because of the number of runs required, which can be as high as 40 runs per well. CT-conveyed perforating guns and a completion insertion retrieval of equipment under pressure (CIRP) system were chosen to execute the task. The fiber-optic CT real-time telemetry system was selected to improve downhole depth accuracy, confirm the underbalance condition, and provide real-time confirmation when the 800 ft of guns detonated downhole. To execute the six-well campaign safely, a customized 100-ft CT tower was brought into the country. Because this was the first in-country application for fiber-optic-enabled CT in single-trip with an 800-ft underbalanced perforation interval, thorough planning and preparation were critical for a successful campaign. Considering the high gas rate, high CO2, and H2S content, a downhole lubricator valve was added as additional barrier during undeployment, and an H2S and CO2 inhibitor was used to protect CT string integrity. Another risk mitigation plan was to utilize real-time CT inspection to monitor the CT integrity and condition throughout the job. Slickline deployment was used in first two wells to deploy multiple guns into the well, but this was deemed inefficient. The CT deployment method was used to complete the campaign. The project comprised a total of 2,200 operating hours, 29 CT runs, and 4,969 ft of guns in six trips with 917 ft as the longest interval. All six wells were completed with no HSE events, no automotive incidents, 98% operational efficiency, and 21% faster than planned duration. This successful six-well campaign represents a first in-country application, which contributed to developing this main gas reserve. The campaign provides lessons for job planning and preparation, technology implementation, execution, and continuous improvement, which can be implemented in similar projects in Indonesia and around the region.


2019 ◽  
Author(s):  
Vanesa Vera ◽  
Carlos Torres ◽  
Eduardo Delgado ◽  
Carlos Pacheco ◽  
Monica Torres ◽  
...  
Keyword(s):  

2018 ◽  
Author(s):  
Azwan Keong ◽  
Christoffer Sorensen ◽  
Youssef Andaloussi

Sign in / Sign up

Export Citation Format

Share Document