ScienceGate
Advanced Search
Author Search
Journal Finder
Blog
Sign in / Sign up
ScienceGate
Search
Author Search
Journal Finder
Blog
Sign in / Sign up
Advanced emissions control development project. Phase I, Final report, November 1, 1993--February 19, 1996
Mapping Intimacies
◽
10.2172/375658
◽
1996
◽
Author(s):
Keyword(s):
Phase I
◽
Development Project
◽
Final Report
◽
Emissions Control
Get full-text (via PubEx)
Related Documents
Cited By
References
Advanced emissions control development project. Phase I final report appendices, November 1, 1993--February 29, 1996
10.2172/249274
◽
1996
◽
Author(s):
G.A. Farthing
Keyword(s):
Phase I
◽
Development Project
◽
Final Report
◽
Emissions Control
Get full-text (via PubEx)
Advanced emissions control development project. Final report, November 1, 1993--February 29, 1996. Phase I
10.2172/249288
◽
1996
◽
Author(s):
G.A. Farthing
Keyword(s):
Phase I
◽
Development Project
◽
Final Report
◽
Emissions Control
Get full-text (via PubEx)
Metal hydride/chemical heat-pump development project. Phase I. Final report
10.2172/6732304
◽
1982
◽
Author(s):
T.A. Argabright
Keyword(s):
Phase I
◽
Heat Pump
◽
Metal Hydride
◽
Development Project
◽
Final Report
◽
Chemical Heat
◽
Chemical Heat Pump
Get full-text (via PubEx)
Advanced emissions control development project. Phase 1 final report appendices, November 1, 1993--February 29, 1996
10.2172/383559
◽
1996
◽
Author(s):
Keyword(s):
Phase 1
◽
Development Project
◽
Final Report
◽
Emissions Control
Get full-text (via PubEx)
Review of the Carrier Approach Criteria for Carrier-Based Aircraft - Phase I: Final Report
10.21236/ada411068
◽
2002
◽
Cited By ~ 13
Author(s):
Thomas Rudowsky
◽
Marshall Hynes
◽
Melvin Luter
◽
Robert Niewoehner
◽
Page Senn
Keyword(s):
Phase I
◽
Final Report
Get full-text (via PubEx)
The Cost Benefit Analysis on the Swan River Flood Management and Integrated Land Development Project - Phase I & Phase II: Stage I
SSRN Electronic Journal
◽
10.2139/ssrn.1152238
◽
2008
◽
Author(s):
Srinivasulu Rajendran
Keyword(s):
Phase I
◽
Cost Benefit Analysis
◽
Land Development
◽
Cost Benefit
◽
Flood Management
◽
Development Project
◽
Benefit Analysis
◽
River Flood
◽
The Cost
◽
Swan River
Get full-text (via PubEx)
Plug and Play Components for Building-Integrated PV Systems: Phase I--Final Report, 20 February 2002--19 February 2003
10.2172/15008786
◽
2004
◽
Cited By ~ 1
Author(s):
M C Russell
Keyword(s):
Phase I
◽
Final Report
◽
Plug And Play
◽
Pv Systems
Get full-text (via PubEx)
Solar Pilot Plant: Phase I. Final report, July 1, 1975--July 1, 1977
10.2172/6742964
◽
1978
◽
Cited By ~ 1
Author(s):
Keyword(s):
Phase I
◽
Pilot Plant
◽
Final Report
Get full-text (via PubEx)
Utilization of ash from municipal solid waste combustion. Final report, Phase I
10.2172/10103676
◽
1994
◽
Cited By ~ 1
Author(s):
C.M. Jones
◽
R.M. Hartman
◽
D. Kort
◽
N. Rapues
Keyword(s):
Phase I
◽
Municipal Solid Waste
◽
Solid Waste
◽
Final Report
◽
Waste Combustion
Get full-text (via PubEx)
Open-Source Integrated Design-Analysis Environment for Nuclear Energy Advanced Modeling & Simulation Phase I Final Report
10.2172/1349054
◽
2014
◽
Author(s):
Patrick O'Leary
Keyword(s):
Phase I
◽
Open Source
◽
Nuclear Energy
◽
Integrated Design
◽
Design Analysis
◽
Final Report
◽
Modeling Simulation
◽
Analysis Environment
Get full-text (via PubEx)
Sign in / Sign up
Close
Export Citation Format
Close
Share Document
Close